Sponsored Content
Full Discussion: user migration
Top Forums UNIX for Dummies Questions & Answers user migration Post 4229 by Neo on Saturday 21st of July 2001 05:12:21 PM
Old 07-21-2001
Keep your user space, files, documents, executables on a separate disk and mount the new disk when you bring up the new OS.

If you properly plan and manage your filesystem, upgrades and migration are easy.
 

10 More Discussions You Might Find Interesting

1. UNIX for Dummies Questions & Answers

Migration

Is it possible to migrate a UNIX program and use it in a NetWare or Windows 2000 network? I have a client that must have one of those two operating systems for the new program that they want. However, they've been using an older UNIX program for about 7 years and they want to be able to refer to... (7 Replies)
Discussion started by: refram
7 Replies

2. UNIX for Advanced & Expert Users

migration

hi, is there any tool that i can use to update my scripts (SH scripts) form Unix to linux. please mention any useful websites. thanx in advance (2 Replies)
Discussion started by: omran
2 Replies

3. UNIX for Dummies Questions & Answers

Migration to Unix

Hello, I work for a very small ISP who up until now has run a combination of Win2000 and NT4 servers for our services (mail, DNS, dial-up). Our equipment is showing it's age and we have been looking into changing into a Unix environment. Our biggest challenge right now is our dial-up... (1 Reply)
Discussion started by: Kukur
1 Replies

4. HP-UX

AS/U -> samba migration

Hi, I'm having some trouble finding a suitable howto for a migration process from asu to samba (both running on hpux). Does any kind of automated migration scripts exist? And if not: how to do that from hand? I did several researches at the company's knowledge base and on the internet but... (0 Replies)
Discussion started by: Frank_S
0 Replies

5. UNIX for Advanced & Expert Users

Migration

Hi all, Would appreciate advise on my situation. Currently server A is in production. Server A takes in data from Server X, does some processing and send to server Y. We are going to develop a different system in server B, something like an enhanced version of A. Server A will be retired once... (2 Replies)
Discussion started by: new2ss
2 Replies

6. UNIX for Dummies Questions & Answers

process migration

how can i migrate a running process in unix to another node for load balancing? (3 Replies)
Discussion started by: aisalihu
3 Replies

7. AIX

User and Printer Migration

Hello I am migrating from an AIX 4.3.0 server to a new AIX 5.3 on a p5. I have lots of users and printers. Is there an easy way to migrate these to the new server? Thanks Mike (1 Reply)
Discussion started by: mhenryj
1 Replies

8. Cybersecurity

Password encryption - migration user accounts from SuSe to RedHat

Hello guys, I'm currently working on replacing old server and it's migration from SuSe SUSE Linux Enterprise Server 10 (x86_64) VERSION = 10 PATCHLEVEL = 4 to the RedHat Red Hat Enterprise Linux Server release 6.4 (Santiago) Problem seems be in migration of users passwords,... (2 Replies)
Discussion started by: brusell
2 Replies

9. AIX

Server migration

Hi, Existing several p5 server with lpar (aix5.3), also implemented with hacmp. And now planning to buy new set of server (installing aix7.1)and SAN to replace the existing server. My question is, how to perform data migration from old server/SAN to new server/SAN. Suppose I install... (6 Replies)
Discussion started by: Oceanlo2013
6 Replies

10. AIX

AIX - FC Switch migration, SAN Migration question!

I'm New to AIX / VIOS We're doing a FC switch cutover on an ibm device, connected via SAN. How do I tell if one path to my remote disk is lost? (aix lvm) How do I tell when my link is down on my HBA port? Appreciate your help, very much! (4 Replies)
Discussion started by: BG_JrAdmin
4 Replies
SWITCH_ROOT(8)						       System Administration						    SWITCH_ROOT(8)

NAME
switch_root - switch to another filesystem as the root of the mount tree SYNOPSIS
switch_root [-hV] switch_root newroot init [arg...] DESCRIPTION
switch_root moves already mounted /proc, /dev, /sys and /run to newroot and makes newroot the new root filesystem and starts init process. WARNING: switch_root removes recursively all files and directories on the current root filesystem. OPTIONS
-h, --help Display help text and exit. -V, --version Display version information and exit. RETURN VALUE
switch_root returns 0 on success and 1 on failure. NOTES
switch_root will fail to function if newroot is not the root of a mount. If you want to switch root into a directory that does not meet this requirement then you can first use a bind-mounting trick to turn any directory into a mount point: mount --bind $DIR $DIR SEE ALSO
chroot(2), init(8), mkinitrd(8), mount(8) AUTHORS
Peter Jones <pjones@redhat.com> Jeremy Katz <katzj@redhat.com> Karel Zak <kzak@redhat.com> AVAILABILITY
The switch_root command is part of the util-linux package and is available from https://www.kernel.org/pub/linux/utils/util-linux/. util-linux June 2009 SWITCH_ROOT(8)
All times are GMT -4. The time now is 08:10 AM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy