I need o get yesterday's day of week but im not exactly sure. the actual name is what i want. I can do it with numbers but im not sure with words. (3 Replies)
How to find the Day of the Week of the given Date using perl?
If I have a date in YYY--MM-DD format, how to find the DOW? Based on that, I need to find the following sunday.
Pls help. (5 Replies)
Hi All,
I have date in string format 'YYYY-MM-DD'. I want to know day of the week for this date.
Example. For '2005-08-21' my script should return '0' or Sunday
For '2005-08-22' it should return '1' or Monday
I want piece of code for HP-UX korn shell.
Appreciate reply on this. (5 Replies)
Hi All,
I need to know how to derive the day of the week by passing the value in following format:
Feb 28 2010
The output I'm expecting is Sunday or Sun.
I know, I can use the following code to get the day of the week.
date +%a
But I want to pass the value as a string. Please help... (11 Replies)
I have a problem of Finding Day of the week from date, but i need to do it within awk On SOLARIS
Input:20101007(YYYYMMDD)
Output:Thursday
kindly provide suggestions.
Thanks in advance (8 Replies)
I have a file that looks like:
file1:
www_blank_com 20121008153552
www_blank_com 20121008162542
www_blank_com 20121009040540
www_blank_com 20121009041542
www_blank_com 20121010113548
www_blank_com 20121011113551
www_blank_com 20121012113542
I want the new file to show the day of... (3 Replies)
Hi,
i am writing a ksh shell script to check the last month end date whether it is falling in last 10 week day date, I am not sure How to use "Mr. Perderabo's date calculator", Could you Please let me know how to use to get my requirement, I tried my own script but duplicate week day and... (5 Replies)
Hi All,
I have the below requirement ,
if i give the week number for ex 41 i need to get the date for Monday and thursday for this given week. my expected output is 13/10/2014 (Monday's date) and 16/10/2014 (Thursday's date)
I am using GNU LINUX .
Pls help me with your thoughts.
Thanks in... (7 Replies)
Discussion started by: mohanalakshmi
7 Replies
LEARN ABOUT OSX
widget_calendar
widget_calendar(n) widget::calendar Megawidget widget_calendar(n)
__________________________________________________________________________________________________________________________________________________NAME
widget_calendar - widget::calendar Megawidget
SYNOPSIS
package require Tcl 8.4
package require Tk 8.4
package require widget ?3.0?
widget::calendar pathname ?options?
_________________________________________________________________DESCRIPTION
This package provides a calendar megawidget (snidget).
widget::calendar pathname ?options?
WIDGET OPTIONS -command
A script to evaluate when a date was selected.
-dateformat
The format of the date that is returned. Default: %m/%d/%Y.
-firstday
Set first day the week, Either sunday or monday. It defaults to monday.
-font Select the font used in the widget. It defaults to Helvetica 9.
-highlightcolor
Selects the background color for the day that has been selected. Default: #FFCC00
-language
Specify language of the calendar contents. The language is specified by abbreviations of the languge, for example: en - english, de
- german ... It defaults to en.
Supported languages: en, de, fr, it, es, pt, ru, sv, zh, fi
-shadecolor
Selects the color of the parts that have a shaded background. Default: #888888
-showpast
Specify if the past shall be shown. It is a boolean value and defaults to 1.
-textvariable
Specifies the name of a variable whose value is linked to the entry widget's contents. Whenever the variable changes value, the
widget's contents are updated, and vice versa.
WIDGET COMMAND
pathname get ?what?
Returns a part of the selected date or 'all'. The argument what selects the part. Valid values for what are: day, month, year and all.
'all' is the default and returns the complete date in the format given with -dateformat.
DEFAULT BINDINGS
On creation of the calendar widget the following bindings are installed.
o Up - Move to week before current date
o Down - Move to week after current date
o Left - Move to day before current date
o Right - Move to day after current date
o Control-Left - Move to month before current date
o Control-Right - Move to month after current date
o Control-Up - Move to year before current date
o Control-Down - Move to year after current date
EXAMPLE
package require widget::calendar ; # or widget::all
set t [widget::calendar .t]
pack $t -fill x -expand 1
KEYWORDS
megawidget, snit, widget
widget 0.93 widget_calendar(n)