Old 04-03-2012
Date format is CYYMMDD .
The commands posted suggest that you mean CCYYMMDD.
Please clarify.

Btw: date +%Y gives the year as CCYY, or in more conventional notation YYYY.



Quote:
if I input 1120301
Can't extract a sensible year field from this data, unless you mean the year 112 years after the birth of Christ.
120301 interpreted as yymmdd in current context would be 1st of March 2012. For total unambiguity it should be yyyymmdd i.e. 20120301 - the only way to hold dates in life insurance systems.

Last edited by methyl; 04-03-2012 at 08:41 PM.. Reason: typos
 

10 More Discussions You Might Find Interesting

1. Linux

cron jobs not run

hi, I am newbie, I had set cron jobs to update something on one time very day, I had tested the script, it run fine, but the cron jobs seem never run. some help? Thanks. (4 Replies)
Discussion started by: robertsnoog
4 Replies

2. Shell Programming and Scripting

background jobs exit status and limit the number of jobs to run

i need to execute 5 jobs at a time in background and need to get the exit status of all the jobs i wrote small script below , i'm not sure this is right way to do it.any ideas please help. $cat run_job.ksh #!/usr/bin/ksh #################################### typeset -u SCHEMA_NAME=$1 ... (1 Reply)
Discussion started by: GrepMe
1 Replies

3. Shell Programming and Scripting

limit the number of jobs to run.

i just want to get the BackGround status and limit the number of jobs to run the at a time. can i able get the back ground exit status ? that i code below. can jobs -l limit the number of jobs to run ? total is this script looks fine ? cat run_job.ksh #!/usr/bin/ksh... (0 Replies)
Discussion started by: GrepMe
0 Replies

4. UNIX for Dummies Questions & Answers

Please help me with the run-away cron jobs

I started a cron job on a cluster super computer. I am just a usual user over there and has no root power. The cron job was set by using "crontab -e". It excecutes a perl command every 20 minutes. I could use crontab -l or crontab -r to list or remove the cron job. However, I just found that I... (2 Replies)
Discussion started by: dedema
2 Replies

5. Shell Programming and Scripting

Creating a Schedular to Run the Jobs.

Hi, I have to create a sheduler to run the shell scripts one by one(dependency). Suppose i have 10 scripts. For all the 10 scripts i have a database table containing these scripts_names and status. Executing the first script.if the first status script is only 'success' then go to next... (4 Replies)
Discussion started by: laknar
4 Replies

6. Shell Programming and Scripting

commands to be executed in order for a batch jobs!

Hi All, I am trying to run this script. I have a small problem: each "./goada.sh" command when done produces three files (file1, file2, file3) then they are moved to their respective directory as can be seem from this script snippet here. The script goada.sh sends some commands for some... (1 Reply)
Discussion started by: faizlo
1 Replies

7. Shell Programming and Scripting

specific number jobs run at the same time

Hi, I have more that 100 jobs I can run background, if I want only 4 running at ther same time, how can I write a script to control it? Thanks peter (0 Replies)
Discussion started by: laopi
0 Replies

8. Shell Programming and Scripting

Run multiples jobs in background mod

Hi, I have a problem runnig from script two diferents process in background mod. Is there a limitation to do this? For example echo "Running process one:" ./ProcessOne & echo "Running process two:" ./ProcessTwo & echo "The process are runnig. Bye" The problem is that the... (7 Replies)
Discussion started by: Xedrox
7 Replies

9. Shell Programming and Scripting

Shell script to run multiple jobs and it's dependent jobs

I have multiple jobs and each job dependent on other job. Each Job generates a log and If job completed successfully log file end's with JOB ENDED SUCCESSFULLY message and if it failed then it will end with JOB ENDED with FAILURE. I need an help how to start. Attaching the JOB dependency... (3 Replies)
Discussion started by: santoshkumarkal
3 Replies

10. UNIX for Beginners Questions & Answers

How to run multiple cron jobs?

I have two scripts which I'm tying to run one after the other- this is what I've tried: 00 14 * * * /path/one.sh && /path/two.sh I've also tried putting each script on a different line: 00 14 * * * /path/one.sh 00 14 * * * /path/two.sh Can this be done? (1 Reply)
Discussion started by: $shell_Learner
1 Replies
CALENDAR(3)						   BSD Library Functions Manual 					       CALENDAR(3)

NAME
easterg, easterog, easteroj, gdate, jdate, ndaysg, ndaysj, week, weekday -- Calendar arithmetic for the Christian era LIBRARY
Calendar Arithmetic Library (libcalendar, -lcalendar) SYNOPSIS
#include <calendar.h> struct date * easterg(int year, struct date *dt); struct date * easterog(int year, struct date *dt); struct date * easteroj(int year, struct date *dt); struct date * gdate(int nd, struct date *dt); struct date * jdate(int nd, struct date *dt); int ndaysg(struct date *dt); int ndaysj(struct date *dt); int week(int nd, int *year); int weekday(int nd); DESCRIPTION
These functions provide calendar arithmetic for a large range of years, starting at March 1st, year zero (i.e., 1 B.C.) and ending way beyond year 100000. Programs should be linked with -lcalendar. The functions easterg(), easterog() and easteroj() store the date of Easter Sunday into the structure pointed at by dt and return a pointer to this structure. The function easterg() assumes Gregorian Calendar (adopted by most western churches after 1582) and the functions easterog() and easteroj() compute the date of Easter Sunday according to the orthodox rules (Western churches before 1582, Greek and Russian Orthodox Church until today). The result returned by easterog() is the date in Gregorian Calendar, whereas easteroj() returns the date in Julian Calendar. The functions gdate(), jdate(), ndaysg() and ndaysj() provide conversions between the common "year, month, day" notation of a date and the "number of days" representation, which is better suited for calculations. The days are numbered from March 1st year 1 B.C., starting with zero, so the number of a day gives the number of days since March 1st, year 1 B.C. The conversions work for nonnegative day numbers only. The gdate() and jdate() functions store the date corresponding to the day number nd into the structure pointed at by dt and return a pointer to this structure. The ndaysg() and ndaysj() functions return the day number of the date pointed at by dt. The gdate() and ndaysg() functions assume Gregorian Calendar after October 4, 1582 and Julian Calendar before, whereas jdate() and ndaysj() assume Julian Calendar throughout. The two calendars differ by the definition of the leap year. The Julian Calendar says every year that is a multiple of four is a leap year. The Gregorian Calendar excludes years that are multiples of 100 and not multiples of 400. This means the years 1700, 1800, 1900, 2100 are not leap years and the year 2000 is a leap year. The new rules were inaugurated on October 4, 1582 by deleting ten days following this date. Most catholic countries adopted the new calendar by the end of the 16th century, whereas others stayed with the Julian Calendar until the 20th century. The United Kingdom and their colonies switched on September 2, 1752. They already had to delete 11 days. The function week() returns the number of the week which contains the day numbered nd. The argument *year is set with the year that contains (the greater part of) the week. The weeks are numbered per year starting with week 1, which is the first week in a year that includes more than three days of the year. Weeks start on Monday. This function is defined for Gregorian Calendar only. The function weekday() returns the weekday (Mo = 0 .. Su = 6) of the day numbered nd. The structure date is defined in <calendar.h>. It contains these fields: int y; /* year (0000 - ????) */ int m; /* month (1 - 12) */ int d; /* day of month (1 - 31) */ The year zero is written as "1 B.C." by historians and "0" by astronomers and in this library. SEE ALSO
ncal(1), strftime(3) STANDARDS
The week number conforms to ISO 8601: 1988. HISTORY
The calendar library first appeared in FreeBSD 3.0. AUTHORS
This manual page and the library was written by Wolfgang Helbig <helbig@FreeBSD.org>. BUGS
The library was coded with great care so there are no bugs left. BSD
November 29, 1997 BSD
All times are GMT -4. The time now is 10:37 PM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy