if the condition meets , i should run another script ..how to do that
Quote:
Originally Posted by joeyg
I am not convinced that this can not be done in cron. However, I would set my cron to run a script for every Monday at 3am.
Then, at the beginning of the script, have IT check the date to see if conditions are met to continue or exit. Start with something like:
then if statements to validate the day of month and month number.
Thank you for ur reply :-
can u pls tell me is this correct :-
once i create this shell script which runs the shell RunTheShell.sh , only when the Monday doesnot fall between 05 and 15 th of the month jan , april and dec .
Where and how should i set the crontest.sh to run on every monday at 3am .
I what to find a system date in a shell script and search for it in a file in specific record.
If the record (ENDC) has the same date I what to execute another shell script.
Here is example of the file:
Can someone please help me with this ? (3 Replies)
In my cronjob, I would like to schedule my script.sh to run every minutes. I crontab -e and have in line below but it didn't seems to run at all.
* * * * * script.sh
When I run it manually, I can run it. Is that anything wrong with the above line?
If I change it to something like below,... (4 Replies)
Hi,
I have these changes needed to modify a shell script that will run on a specific date of a month, below pseudocode, appreciate any answers..thanks..
if date of the month is 26th then
..event 1
fi
if date of the month is 26th and month are MAR,JUN,SEP,DEC then
..event2
... (7 Replies)
how to run an already developed script run against a list of ip addresses solaris 8 question.
the script goes away and check traffic information, for example
check_GE-VLANStats-P3 1.1.1.1
and returns the results ok.
how do I run this against an ip list? i.e a list of 30 ip addresses (26 Replies)
i need to run one script inside of other, and there is some terms
- main script in scheduled in cron for everyday runing every 5min
- i need to run /tmp/script2.sh after first 3 days in month
- i need to run /tmp/script2.sh from 7-9AM, main script is runining all day
all recommendations are... (1 Reply)
Hello all,
I'm trying to write a script to gather and send data and it works just fine at the bash command line, but when executing from CRON, it does not run properly.
My scripting skills are pretty limited and there's probably a better way, but as I said it works at the command line, but... (12 Replies)
Hi ,
How would i write a shell script to run the code from one date to another date EXample 2014-01-01 to 2014-02-28, can i any provide some clue on this (4 Replies)
Linux System having all Perl, Python, PHP (and Ruby) installed
From a Shell script, can call a Perl, Python, PHP (or Ruby ?) file
eg
eg
a Shell script run in a case statement call to run a php file, also Perl or/and Python file???
Like
#!/usr/bin/bash
....
....
case $INPUT_STRING... (1 Reply)
Hi Team,
I have a to run a script based on a date present in a different file which updates everyday. Kindly help with the solution.
My current execution : ksh scriptname.sh 10152019. But here i want to enter this date from a file which gets updated daily.
My appraoch :
date file location:... (3 Replies)
Discussion started by: midhun3108
3 Replies
LEARN ABOUT HPUX
calendar
calendar(1) General Commands Manual calendar(1)NAME
calendar - reminder service
SYNOPSIS DESCRIPTION
consults the file in the current directory and prints out lines containing today's or tomorrow's date anywhere in the line. On weekends,
``tomorrow'' extends through Monday.
When a command-line argument is present, searches for the file in each user's home directory, and sends any positive results to the user by
(see mail(1)). Normally this is done daily in the early morning hours under the control of (see cron(1M)). When invoked by reads the
first line in the file to determine the user's environment.
Language-dependent information such as spelling and date format (described below) are determined by the user-specified statement in the
file. This statement should be of the form where language is a valid language name (see lang(5)). If this line is not in the file, the
action described in the section is taken.
is concerned with two fields: month and day. A month field can be expressed in three different formats: a string representing the name of
the month (either fully spelled out or abbreviated), a numeric month, or an asterisk (representing any month). If the month is expressed
as a string representing the name of the month, the first character can be either upper-case or lower-case; other characters must be lower-
case. The spelling of a month name should match the string returned by calling (see nl_langinfo(3C)). The day field is a numeric value
for the day of the month.
Month-Day Formats
If the month field is a string, it can be followed by zero or more blanks. If the month field is numeric, it must be followed by either a
slash or a hyphen If the month field is an asterisk it must be followed by a slash The day field can be followed immediately by a blank or
non-digit character.
Day-Month Formats
The day field is expressed as a numeral. What follows the day field is determined by the format of the month. If the month field is a
string, the day field must be followed by zero or one dot followed by zero or more blanks. If the month field is a numeral, the day field
must be followed by either a slash or a hyphen If the month field is an asterisk, the day field must be followed by a slash
EXTERNAL INFLUENCES
Environment Variables
determines the format and contents of date and time strings when no statement is specified in the file.
determines the language in which messages are displayed.
If is not specified in the environment or is set to the empty string, the value of is used as a default for each unspecified or empty vari-
able. If is not specified or is set to the empty string, a default of "C" (see lang(5)) is used instead of If any internationalization
variable contains an invalid setting, behaves as if all internationalization variables are set to "C". See environ(5).
International Code Set Support
Single- and multi-byte character code sets are supported.
EXAMPLES
The following file illustrates several formats recognized by calendar:
In the following file, dates are expressed according to European English usage:
WARNINGS
To get reminder service, either your calendar must be public information or you must run from your personal file, independent of any run
systemwide. Note that if you run yourself, the calendar file need not reside in your home directory.
extended idea of ``tomorrow'' does not account for holidays.
This command is likely to be withdrawn from X/Open standards. Applications using this command might not be portable to other vendors'
platforms.
AUTHOR
was developed by AT&T and HP.
FILES
to figure out today's and tomorrow's dates
SEE ALSO
cron(1M), nl_langinfo(3C), mail(1), environ(5).
STANDARDS CONFORMANCE calendar(1)