Hi,
I'm writing a script and have become stuck trying to define a variable (COMP) by adding an elapsed time (ELAPSE e.g 00:55) to a start time (START e.g 23:50).
Can anybody give me a solution as to how I can get a completion time in hh:mm from the variables above?
thanks
Richard (4 Replies)
Is there anyway to get the start time and end time / status of a crontab job which was just completed? Of course, we know the start time of the crontab job since we are scheduling. But I would like to know process start and time recorded somewhere or can be fetched from a command like 'ps'. ... (3 Replies)
Hello All,
Below mentioned is my log file.
I want to make a script which ask for start time and then end time and then search particular word between those lines.
Like
start time:2
end time: 4
and then search all values starting from cell 84 between this time.
Please Help
... (2 Replies)
Process start time is not showing the correct time:
I had started a process on Jun 17th at 23:30:00.
Next day morning when I run the command "ps -ef | grep mq", the process is showing the start date of Jun 17th but the start time is 00:16:41
Day/Date is setup correctly on the server.
It... (2 Replies)
Hi All,
Can we get to know the start time and end time of execution of a script? (This script doesn't write any logs.) I mean, is there any built in process logs to track these records? (2 Replies)
Hello All,
I have a problem calculating the time difference between start and end timings...!
the timings are given by 24hr format..
Start Date : 08/05/10 12:55
End Date : 08/09/10 06:50
above values are in mm/dd/yy hh:mm format.
Now the thing is, 7th(08/07/10) and... (16 Replies)
Hi guys,
How can I specify the start and end time of a cron job. And my start time and end time are specified by minutes. For example, I want to set up a cron runs every 3 minutes from 18:40 to midnight. How can i do this please? Many thanks
Best regards,
Clu (4 Replies)
Oracle Enterprise Linux
We want to track how long a process takes to complete its execution. This is what we want in the schell script
Before the process is started , get the time with date, hours and minutes
execute the process
After the process has ended , get the time with date,... (5 Replies)
Dear team
I am using DB2 and wish to capture the ETL status on daily basis so that i can run the query and share the details in xls format to respective mail ids .
Currently i am using below query but this displays table name and counts for latest run.
select name ,CARD from... (0 Replies)
Discussion started by: Perlbaby
0 Replies
LEARN ABOUT PLAN9
split
SPLIT(1) General Commands Manual SPLIT(1)NAME
split - split a file into pieces
SYNOPSIS
split [ option ... ] [ file ]
DESCRIPTION
Split reads file (standard input by default) and writes it in pieces of 1000 lines per output file. The names of the output files are xaa,
xab, and so on to xzz. The options are
-n Split into n-line pieces.
-e expression
File divisions occur at each line that matches a regular expression; see regexp(6). Multiple -e options may appear. If a subex-
pression of expression is contained in parentheses (...), the output file name is the portion of the line which matches the subex-
pression.
-f stem
Use stem instead of x in output file names.
-s suffix
Append suffix to names identified under -e.
-x Exclude the matched input line from the output file.
-i Ignore case in option -e; force output file names (excluding the suffix) to lower case.
SOURCE
/sys/src/cmd/split.c
SEE ALSO sed(1), awk(1)grep(1), regexp(6)SPLIT(1)