In Autosys whenever the main box kicks off, all the sub boxes should be in running status and command/FW jobs will be either in RU or AC Status. So if you need the Sub-box to kick of at 11:30 instead at 10:00 then move the start time condition from the box job pull-files to the first job inside that box. so that even if the box pull-files started at 10:00 the jobs inside that box will be in AC status till 11:30 and will start to run per time condition
In order to execute the Boxes to run as per the schedule, please schedule the Boxes to run at the required start-times. If you want the sub box to run at 11:30 AM LT, why the main box is scheduled to run at 10:00 AM LT? You can trigger the Main box itself to run at 11:30.
The scenario you explained above is called Pending Run in Autosys. It happens when the main box stopped running before even the sub box started. So, from then the sub box is experiencing the pending run here. I suggest to use update option in Autosys CLI to update the start time of the sub box before 10 AM LT.
Can anyone please tell me how to refresh the jobs in Autosys Scheduler?
---------- Post updated at 03:19 PM ---------- Previous update was at 03:18 PM ----------
I need a command to refresh it. (2 Replies)
Hi All,
We run Many jobs evryday using Autosys. Sometimes due to various reason we got to run the job from terminal as well (using nohup).
We observed that the job running through terminal(nohup) takes much less time then the autosys (for same job).
What can be the possible reason for such... (1 Reply)
Hi, I have created an autosys job which calls an exe and updates its output files. The job is failing without updating the output and error files.
I if restart the usvmapgrnd01.pc.ml.com machine, the job runs successful for first time and fails rest of the time. Please let me know what might be... (0 Replies)
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (1 Reply)
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (2 Replies)
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (0 Replies)
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (0 Replies)
My project uses Autosys.
I am new to this product and I don't know where to start from.
Q1. Please provide me the link where I can get Autosys documentation
Q2. Please refer a good book on Autosys. (Beginner/Intermediate Level) (0 Replies)