First my apologize for not putting the actual data.
The Year I should take will always be on column 4. in the above scenario. We are having as P201835. The column I need check the do the subtraction is 2,4,10
I tried changing the awk code like this and ran. It give me the same output as original and no change
Last edited by arunkumar_mca; 11-02-2018 at 12:14 PM..
Hi i am trying to subtract days from current date. For example todays date is 10/03/2006. If i subtract 2 days it should give 8/03/2006. I am also trying to find the access date of a file in dd/mm/yyyy format. Can any one please help in how to do this.
Ramesh (1 Reply)
I have looked through the forums and found many date / time manipulation tools, but cannot seem to find something that fits my needs for the following.
I have a log file with date time stamps like this:
Jun 21 17:21:52
Jun 21 17:24:56
Jun 21 17:27:59
Jun 21 17:31:03
Jun 21 17:34:07
Jun... (0 Replies)
Dear Expert,
Is there a command to do that in Unix?
In such a way that we don't need to actually "write" or
modified the content.
-- monkfan (4 Replies)
how can we add or subtract days from the output of date command in unix...
like if i want to subtract a day from the result of date command like this..
v_date=`date +%Y%m%d`
this wud give me 20080519
now i want to subtract one day from this.. so tht it wud give me 20080518..
how do i do... (1 Reply)
Hi all,
I'm using Red Hat Linux and want to move some folders and files around but not change the modified date. Is this possible?
I know cp has a -p flag which seems to do what I want, but this is a large volume of data so copying and deleting would not be feasible. (13 Replies)
I got a statement like below to subtract 1 from given date using teradata. I am looking for a one line unix command to perform the same.
select 'parse_this_record', (DATE '${FILE_DATE}' - 1) (FORMAT 'YYYY-MM-DD');
Input: 2012-02-21
Expected Output: 2012-02-20
PS: One liner because I am... (2 Replies)
I have a CSV file with a date format like this;
11/19/2012 17:37:00,1.372,121.6
11/19/2012 17:38:00,0.743,121.6
Want to change the time stamp to seconds after 1970 so I can get the data in rrdtool. For anyone interested, this is data from a TED5000 unit and is Kwatts and volts.
Needs to... (3 Replies)
Hi All,
I am getting a date from environment variable and want to do some processing by subtracting 2 months from the date passed through the environment variable.
I am trying the following syntax :
date_var=2014-08-31
date_2M_ago='$date_var+"%d%m%y" --$date_var="2 months ago" '... (3 Replies)
I am trying to achieve to get only the month and the day. Example Feb 5 (as you can see if it is feb 1-9) the space is 2. If it is feb 10-28, the space is only 1. I am trying to right a script that will list a directory and shoot an email if there is an activity in last 7 days. I dont really trust... (5 Replies)
Discussion started by: invinzin21
5 Replies
LEARN ABOUT FREEBSD
week
CALENDAR(3) BSD Library Functions Manual CALENDAR(3)NAME
easterg, easterog, easteroj, gdate, jdate, ndaysg, ndaysj, week, weekday -- Calendar arithmetic for the Christian era
LIBRARY
Calendar Arithmetic Library (libcalendar, -lcalendar)
SYNOPSIS
#include <calendar.h>
struct date *
easterg(int year, struct date *dt);
struct date *
easterog(int year, struct date *dt);
struct date *
easteroj(int year, struct date *dt);
struct date *
gdate(int nd, struct date *dt);
struct date *
jdate(int nd, struct date *dt);
int
ndaysg(struct date *dt);
int
ndaysj(struct date *dt);
int
week(int nd, int *year);
int
weekday(int nd);
DESCRIPTION
These functions provide calendar arithmetic for a large range of years, starting at March 1st, year zero (i.e., 1 B.C.) and ending way beyond
year 100000.
Programs should be linked with -lcalendar.
The functions easterg(), easterog() and easteroj() store the date of Easter Sunday into the structure pointed at by dt and return a pointer
to this structure. The function easterg() assumes Gregorian Calendar (adopted by most western churches after 1582) and the functions
easterog() and easteroj() compute the date of Easter Sunday according to the orthodox rules (Western churches before 1582, Greek and Russian
Orthodox Church until today). The result returned by easterog() is the date in Gregorian Calendar, whereas easteroj() returns the date in
Julian Calendar.
The functions gdate(), jdate(), ndaysg() and ndaysj() provide conversions between the common "year, month, day" notation of a date and the
"number of days" representation, which is better suited for calculations. The days are numbered from March 1st year 1 B.C., starting with
zero, so the number of a day gives the number of days since March 1st, year 1 B.C. The conversions work for nonnegative day numbers only.
The gdate() and jdate() functions store the date corresponding to the day number nd into the structure pointed at by dt and return a pointer
to this structure.
The ndaysg() and ndaysj() functions return the day number of the date pointed at by dt.
The gdate() and ndaysg() functions assume Gregorian Calendar after October 4, 1582 and Julian Calendar before, whereas jdate() and ndaysj()
assume Julian Calendar throughout.
The two calendars differ by the definition of the leap year. The Julian Calendar says every year that is a multiple of four is a leap year.
The Gregorian Calendar excludes years that are multiples of 100 and not multiples of 400. This means the years 1700, 1800, 1900, 2100 are
not leap years and the year 2000 is a leap year. The new rules were inaugurated on October 4, 1582 by deleting ten days following this date.
Most catholic countries adopted the new calendar by the end of the 16th century, whereas others stayed with the Julian Calendar until the
20th century. The United Kingdom and their colonies switched on September 2, 1752. They already had to delete 11 days.
The function week() returns the number of the week which contains the day numbered nd. The argument *year is set with the year that contains
(the greater part of) the week. The weeks are numbered per year starting with week 1, which is the first week in a year that includes more
than three days of the year. Weeks start on Monday. This function is defined for Gregorian Calendar only.
The function weekday() returns the weekday (Mo = 0 .. Su = 6) of the day numbered nd.
The structure date is defined in <calendar.h>. It contains these fields:
int y; /* year (0000 - ????) */
int m; /* month (1 - 12) */
int d; /* day of month (1 - 31) */
The year zero is written as "1 B.C." by historians and "0" by astronomers and in this library.
SEE ALSO ncal(1), strftime(3)STANDARDS
The week number conforms to ISO 8601: 1988.
HISTORY
The calendar library first appeared in FreeBSD 3.0.
AUTHORS
This manual page and the library was written by Wolfgang Helbig <helbig@FreeBSD.org>.
BUGS
The library was coded with great care so there are no bugs left.
BSD November 29, 1997 BSD