Sponsored Content
The Lounge What is on Your Mind? Cut Over to New Data Center and Upgraded OS Done. :) Post 303022824 by RavinderSingh13 on Saturday 8th of September 2018 02:09:02 AM
Old 09-08-2018
Quote:
Originally Posted by Neo
Three days ago we received an expected notice from our long time data center that they were going dark on Sept 12th.

About one and a half hours ago, after three days of marathon work, I just cut over the unix.com to a new data center with a completely new OS and Ubuntu distribution.
Awesome Neo, you ROCK Smilie


Thanks,
R. Singh
 

5 More Discussions You Might Find Interesting

1. Virtualization and Cloud Computing

Cloud Enabling Computing for the Next Generation Data Center

Hear how the changing needs of massive scale-out computing is driving a transfomation in technology and learn how HP is supporting this new evolution of the web. More... (1 Reply)
Discussion started by: Linux Bot
1 Replies

2. HP-UX

Need to set up a HP cluster system in a data center

What are the server requirements, Software requirements, Network requirements etc, Please help me.. as 'm new 'm unable to get things done @ my end alone. Please refrain from typing subjects completely in upper case letters to get more attention, ty. (5 Replies)
Discussion started by: Sounddappan
5 Replies

3. Shell Programming and Scripting

Failure rate of a node / Data center

Hi, Please, i have a history of the state of each node in my data center. an history about the failure of my cluster (UN: node up, DN: node down). Here is some lines of the history: 08:51:36 UN 127.0.0.1 08:51:36 UN 127.0.0.2 08:51:36 UN 127.0.0.3 08:53:50 DN 127.0.0.1 ... (6 Replies)
Discussion started by: chercheur111
6 Replies

4. What is on Your Mind?

Resolved: Issue in Server Data Center

Dear All, There was a problem in the data center data, which caused the server to be unreachable for about an hour. Server logs show the server did not crash or go down. Hence, I assume there was a networking issue at the data center. Still waiting for final word on what happened. ... (4 Replies)
Discussion started by: Neo
4 Replies

5. What is on Your Mind?

OUTAGE: Data Center Problem Resolved.

There was a problem with our data center today, creating a site outage (server unreachable). That problem has been resolved. Basically, it seems to have been a socially engineered denial-of-service attack against UNIX.com; which I stopped as soon as I found out what the problem was. Total... (2 Replies)
Discussion started by: Neo
2 Replies
TPM QUOTE 
TOOLS(8) TPM QUOTE TOOLS(8) NAME
TPM Quote Tools PROGRAMS
tpm_mkuuid, tpm_mkaik, tpm_loadkey, tpm_unloadkey, tpm_getpcrhash, tpm_updatepcrhash, tpm_getquote, tpm_verifyquote DESCRIPTION
TPM Quote Tools is a collection of programs that provide support for TPM based attestation using the TPM quote operation. A TPM contains a set of Platform Configuration Registers (PCRs). In a well configured machine, some of these registers are set to known values during the boot up process or at other times. For example, a PCR might contain the hash of a boot loader in memory before it is run. The TPM quote operation is used to authoritatively verify the contents of a TPM's Platform Configuration Registers (PCRs). During provi- sioning, a composite hash of a selected set of PCRs is computed. The TPM quote operation produces a composite hash that can be compared with the one computed while provisioning. To use the TPM quote operation, keys must be generated. During provisioning, an Attestation Identity Key (AIK) is generated for each TPM, and the public part of the key is made available to entities that validate quotes. The TPM quote operation returns signed data and a signature. The data that is signed contains the PCRs selected for the operation, the composite hash for the selected PCRs, and a nonce provided as input, and used to prevent replay attacks. At provisioning time, the data that is signed is stored, not just the composite hash. The signature is discarded. An entity that wishes to evaluate a machine generates a nonce, and sends it along with the set of PCR used to generate the composite PCR hash at provisioning time. For this use of the TPM quote operation, the signed data is ignored, and the signature returned is used to val- idate the state of the TPM's PCRs. Given the signature, the evaluating entity replaces the nonce in the signed data generated at provi- sioning time, and checks to see if the signature is valid for the data. If so, this check ensures the selected PCRs contain values that match the ones measured during provisioning. A typical scenario for an enterprise using these tools follows. The tools expect AIKs to be referenced via one enterprise-wide Universally Unique Identifier (UUID). The program tpm_mkuuid creates one. For each machine being checked, an AIK is created using tpm_mkaik. The key blob produced is bound to the UUID on its machine using tpm_loadkey. The public key associated with the AIK is sent to the entities that verify quotes. Finally, the expected PCR composite hash is obtained using tpm_getpcrhash. When the expected PCR values change, a new hash can be generated with tpm_updatepcrhash. The program to obtain a quote, and thus measure the current state of the PCRs is tpm_getquote. The program that verifies the quote describes the same PCR composite hash as was measured initially is tpm_verifyquote. SEE ALSO
tpm_mkuuid(8), tpm_mkaik(8), tpm_loadkey(8), tpm_unloadkey(8), tpm_getpcrhash(8), tpm_updatepcrhash(8), tpm_getquote(8), tpm_verifyquote(8) Oct 2010 TPM QUOTE TOOLS(8)
All times are GMT -4. The time now is 10:00 AM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy