08-07-2012
I'd be surprised if this was possible with software.
If you need accurate ambient figures, get an engineer to use a non-intrusive current meter on each mains lead.
However, beware of start-up current which can be much higher just after you power the computer on. This is why we have a designated power-up sequence (with delays) should there be a power-down of a computer room.
The manufacturer's maximum figures should be on the plate near the mains lead of each component.
8 More Discussions You Might Find Interesting
1. HP-UX
Hi All,
Need to find the power consumption of a RX7640 server.
Please help.
Regards,
Sag. (3 Replies)
Discussion started by: sag71155
3 Replies
2. Programming
Hi,
my C++ program does some memory consuming tasks and runs several minutes.
During execution time, I want to print information on the current memory consumption and peak memory consumption of my program into a logfile.
How can I retrieve this information, i.e. which functions are available... (0 Replies)
Discussion started by: DarthVader77
0 Replies
3. AIX
Hello All,
Can anybody please tell me what is the maximum limit of Physical IBM Power Machine which can be handled by single HMC at a single point of time?
Thanks,
Jenish (1 Reply)
Discussion started by: jenish_shah
1 Replies
4. Solaris
hi friends, we are relocating our DC and need to plan out electrical power for the new DC.
are there ways i could find the actual power consumption from my current servers ? instead of the product specs. (2 Replies)
Discussion started by: Exposure
2 Replies
5. UNIX Desktop Questions & Answers
Hi All
I am new to UNIX ,can any one please help in finding MEMORY CONSUMPTION of VLC when i use it as Streaming Server.
I need to log the memory consumption for atleast 10 hours.
Can any one help me in finding this Please (1 Reply)
Discussion started by: ravikanth17
1 Replies
6. AIX
Hi,
This thread has been posted before on linuxquestions.org, but no answer, maybe because this is unix question and not linux. I'm posting the same thread here, hope I can get an answer from someone in the meantime, I wish I could post of emergency thread but it needs bits which I don't have :... (6 Replies)
Discussion started by: aLuViAn
6 Replies
7. AIX
Hi,
I have installed the HMC on the VMWare VM. I try to add the power machine (managed system) and asking for a password? So this is the IBM predefined password of Power Machine?
In the VMWare perspective, we can login to ESX host to do some management tasks. But how about the Power machine?... (6 Replies)
Discussion started by: Phat
6 Replies
8. AIX
Hello,
I would like to check how many SAS disks and its size per disk for the whole power system. As per my understanding, if we assign the SAS controller to LPAR, then we can see the disk in lpar smitty command.
How can we check from the Power machine(physical ones) as well? I think the... (5 Replies)
Discussion started by: Phat
5 Replies
SAFENET(8) NUT Manual SAFENET(8)
NAME
safenet - Driver for SafeNet compatible UPS equipment
NOTE
This man page only documents the hardware-specific features of the safenet driver. For information about the core driver, see nutupsdrv(8).
SUPPORTED HARDWARE
This driver supports UPS equipment which can be controlled via SafeNet v1.0 for Windows (serial interface only).
EXTRA ARGUMENTS
This driver supports the following optional settings in the ups.conf(5) file:
manufacturer=value
Autodetection of this parameter is not possible yet (and it probably never will be). Therefore, this user-defined string accepts any
name. The default is unknown.
modelname=value
Like manufacturer above. The default is unknown.
serialnumber=value
Like manufacturer above. The default is unknown.
ondelay=value
Time to wait before switching on the UPS (minutes). Defaults to 1 minute.
offdelay=value
Time to wait before shutting down the UPS (seconds). Defaults to 30 seconds.
UPSCMD
This driver supports some instant commands (see upscmd(8)):
test.battery.start
Start UPS self test
test.battery.stop
Cancel UPS self test
test.failure.start
Start simulated power failure
test.failure.stop
Cancel simulated power failure
beeper.enable
Enable the UPS beeper
beeper.mute
Temporarily mute the UPS beeper
beeper.toggle
Toggle the UPS beeper
shutdown.return
Turn off the load and wait for the power to return. Uses the timer defined by offdelay.
shutdown.reboot
Turn off the load and return. Uses the timers defined by offdelay and ondelay.
KNOWN PROBLEMS
If you run the shutdown.return command with mains present, the output may stay on or switch off and not back on again. The shutdown.reboot
command will unconditionally switch on the load again (with or without mains present).
If the driver is called with the -k option (or through upsdrvctl shutdown) it tries to detect which command should be used in an attempt to
stay off until mains is present again or to cycle the output if the power returned in the mean time. This isn't bullet-proof, and you
should be prepared that the power will either not be shutdown, or that it doesn't return when the power comes back.
AUTHOR
Arjen de Korte <adkorte-guest at alioth.debian.org>
SEE ALSO
The core driver:
nutupsdrv(8)
Internet resources:
The NUT (Network UPS Tools) home page: http://www.networkupstools.org/
Network UPS Tools 05/21/2012 SAFENET(8)