Sponsored Content
Full Discussion: Calculate the day after bash
Top Forums UNIX for Dummies Questions & Answers Calculate the day after bash Post 302593568 by radoulov on Friday 27th of January 2012 10:19:14 AM
Old 01-27-2012
So I assume the above solution should work for you ...
 

10 More Discussions You Might Find Interesting

1. Shell Programming and Scripting

Cron to run first day of month to calculate date 3 months ago

Hi, I would like to find out how can i calculate a date which is 3 months ago. I intend to run a cron job on the 1st of every month, and calculate the month 4 months earlier from the date. For example, if today's date is 1st May 2007, i would like to return 012007( January 2007). i can get... (1 Reply)
Discussion started by: new2ss
1 Replies

2. Shell Programming and Scripting

Find out the day in Bash Shell script

Hello All, I need a bash shell script to find out a day from the date.For example we give the date(20100227/YYYYMMDD) then we get the day 'Saturday'. Thanks in advance, Satheesh (5 Replies)
Discussion started by: satheesh4093
5 Replies

3. Shell Programming and Scripting

Calculate age of a file | calculate time difference

Hello, I'm trying to create a shell script (#!/bin/sh) which should tell me the age of a file in minutes... I have a process, which delivers me all 15 minutes a new file and I want to have a monitoring script, which sends me an email, if the present file is older than 20 minutes. To do... (10 Replies)
Discussion started by: worm
10 Replies

4. Shell Programming and Scripting

KSH script Not working (calculate days since 1/1/2000 given day 4444)

I am unable to get this KSH script to work. Can someone help. I've been told this should work with KSH93. Which I think I have on Solaris 10. If I do a grep -i version /usr/dt/bin/dtksh I get @(#)Version M-12/28/93d @(#)Version 12/28/93 @(#)Version M-12/28/93 This is correct for... (5 Replies)
Discussion started by: thibodc
5 Replies

5. Shell Programming and Scripting

Calculate the number of days between 2 dates - bash script

I wrote the day calculator also in bash. I would like to now, that is it good so? #!/bin/bash datum1=`date -d "1991/1/1" "+%s"` datum2=`date "+%s"` diff=$(($datum2-$datum1)) days=$(($diff/(60*60*24))) echo $days Thanks in advance for your help! (3 Replies)
Discussion started by: kovacsakos
3 Replies

6. UNIX for Dummies Questions & Answers

[Solved] How to calculate in sun bash

I have two problems, and it would be great if someone could help me: The first line does not calculate. I have checked the origin term to calculate the variables and the result is OK. Normal substactions with $xx -100 work, but not in this constallation. I tried it with "| bc" and no result... (2 Replies)
Discussion started by: Pieter0815
2 Replies

7. Shell Programming and Scripting

Calculate given date - 1 day

Hi Team, We have a requirement as follows. If a date 20141220 as parameter to the script, then the script has to return the output as 20141219. i.e given date - 1. The requirement is simple. But it should satisfy leap year, the months having 31 and 30 days, the date in which day light... (9 Replies)
Discussion started by: kmanivan82
9 Replies

8. Shell Programming and Scripting

Bash cript to calculate summarize address

Hi, I need to write a bash script that when i enter two ip address, it will calculate summerize address for them. Examlpe: 192.168.1.27/25 192.168.1.129/25 Result will be: 192.168.1.0/24 can you help me with this script? I even dont know how to start with it (3 Replies)
Discussion started by: Miron
3 Replies

9. Shell Programming and Scripting

Bash to calculate average of all files in directory and output by part of filename

I am trying to use awk to calculate the average of all lines in $2 for every file in a directory. The below bash seems to do that, but I cannot figure out how to capture the string before the _ as the output file name and have it be tab-delimeted. Thank you :). Filenames in... (3 Replies)
Discussion started by: cmccabe
3 Replies

10. Shell Programming and Scripting

How to check day name is it saturday in bash shell script?

How to check the day name,is it saturday in bash shell script. If dayname = saturday then run the full load else run just the incremental loads end if Thank you very much for the helpful information. (4 Replies)
Discussion started by: cplusplus1
4 Replies
ZPTRFS(l)								 )								 ZPTRFS(l)

NAME
ZPTRFS - improve the computed solution to a system of linear equations when the coefficient matrix is Hermitian positive definite and tridiagonal, and provides error bounds and backward error estimates for the solution SYNOPSIS
SUBROUTINE ZPTRFS( UPLO, N, NRHS, D, E, DF, EF, B, LDB, X, LDX, FERR, BERR, WORK, RWORK, INFO ) CHARACTER UPLO INTEGER INFO, LDB, LDX, N, NRHS DOUBLE PRECISION BERR( * ), D( * ), DF( * ), FERR( * ), RWORK( * ) COMPLEX*16 B( LDB, * ), E( * ), EF( * ), WORK( * ), X( LDX, * ) PURPOSE
ZPTRFS improves the computed solution to a system of linear equations when the coefficient matrix is Hermitian positive definite and tridi- agonal, and provides error bounds and backward error estimates for the solution. ARGUMENTS
UPLO (input) CHARACTER*1 Specifies whether the superdiagonal or the subdiagonal of the tridiagonal matrix A is stored and the form of the factorization: = 'U': E is the superdiagonal of A, and A = U**H*D*U; = 'L': E is the subdiagonal of A, and A = L*D*L**H. (The two forms are equivalent if A is real.) N (input) INTEGER The order of the matrix A. N >= 0. NRHS (input) INTEGER The number of right hand sides, i.e., the number of columns of the matrix B. NRHS >= 0. D (input) DOUBLE PRECISION array, dimension (N) The n real diagonal elements of the tridiagonal matrix A. E (input) COMPLEX*16 array, dimension (N-1) The (n-1) off-diagonal elements of the tridiagonal matrix A (see UPLO). DF (input) DOUBLE PRECISION array, dimension (N) The n diagonal elements of the diagonal matrix D from the factorization computed by ZPTTRF. EF (input) COMPLEX*16 array, dimension (N-1) The (n-1) off-diagonal elements of the unit bidiagonal factor U or L from the factorization computed by ZPTTRF (see UPLO). B (input) COMPLEX*16 array, dimension (LDB,NRHS) The right hand side matrix B. LDB (input) INTEGER The leading dimension of the array B. LDB >= max(1,N). X (input/output) COMPLEX*16 array, dimension (LDX,NRHS) On entry, the solution matrix X, as computed by ZPTTRS. On exit, the improved solution matrix X. LDX (input) INTEGER The leading dimension of the array X. LDX >= max(1,N). FERR (output) DOUBLE PRECISION array, dimension (NRHS) The forward error bound for each solution vector X(j) (the j-th column of the solution matrix X). If XTRUE is the true solution corresponding to X(j), FERR(j) is an estimated upper bound for the magnitude of the largest element in (X(j) - XTRUE) divided by the magnitude of the largest element in X(j). BERR (output) DOUBLE PRECISION array, dimension (NRHS) The componentwise relative backward error of each solution vector X(j) (i.e., the smallest relative change in any element of A or B that makes X(j) an exact solution). WORK (workspace) COMPLEX*16 array, dimension (N) RWORK (workspace) DOUBLE PRECISION array, dimension (N) INFO (output) INTEGER = 0: successful exit < 0: if INFO = -i, the i-th argument had an illegal value PARAMETERS
ITMAX is the maximum number of steps of iterative refinement. LAPACK version 3.0 15 June 2000 ZPTRFS(l)
All times are GMT -4. The time now is 01:01 AM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy