Hi All,
I am trying to generate quarter dates with user giving input as begin date and end date. Example: Input by user:
begin_date = "2009-01-01"
end_date = 2010-04-30"
required output:
2009-01-01 2009-03-31 09Q01
2009-04-01 2009-06-30 09Q02
.
.
till
2010-01-01 2010-03-31 10Q01
... (9 Replies)
Hi All,
I have problem in my file. It has two date variable.
There are 2 variables which has the values as below
1. START_MONTH = “Date(YYYYMM) format” Ex: 201008
2. END_MONTH = “Date(YYYYMM) format” Ex: 201105
The end date should be greater than start date.
Now we... (3 Replies)
Hi All,
I enter Start date and end date as parameters. I need to capture dates between start date and end date. Please let me know if you have any idea the same.
Thanks in advance.
Nagaraja Akkivalli. (5 Replies)
Hi All,
what i want to do in perl is i should give the date at run time .Suppose date given is 23/12/2011(mm/dd/yyyy) the perl script shold find week start date, week end date, previous week start date,end date,next week start date, end date. In this case
week start date will be-:12/19/2011... (2 Replies)
Hi guys,
I am having the below logfile,date in yyyy-mm-dd
2013-08-02 *some content*
2013-08-02 *some content*
2013-08-02 *some content*
2013-08-03 *some content*
2013-08-05 *some content*
from the above logfile i need to get the lines between the two timestamps,if i give... (5 Replies)
Dear all,
I have an user passing 2 parameter 31/03/2015 and 02/04/2015 to a ksh script. How to print the start date to end date.
Expected output is :
31/03/2015
01/04/2015
02/04/2015
Note :
1. Im using aix and ksh
2. I have tried to convert the given input into a date, didnt... (0 Replies)
Below are my custom period start and end dates based on a calender, these dates are placed in a file, for each period i need to split into three weeks for each period row, example is given below.
Could you please help out to achieve solution through shell script..
File content:
... (2 Replies)