05-14-2011
Thanks for your response, Kumaran. Will check this out.
7 More Discussions You Might Find Interesting
1. Shell Programming and Scripting
Hi All,
I am trying to generate quarter dates with user giving input as begin date and end date. Example: Input by user:
begin_date = "2009-01-01"
end_date = 2010-04-30"
required output:
2009-01-01 2009-03-31 09Q01
2009-04-01 2009-06-30 09Q02
.
.
till
2010-01-01 2010-03-31 10Q01
... (9 Replies)
Discussion started by: sol_nov
9 Replies
2. Shell Programming and Scripting
Hi All,
I have problem in my file. It has two date variable.
There are 2 variables which has the values as below
1. START_MONTH = “Date(YYYYMM) format” Ex: 201008
2. END_MONTH = “Date(YYYYMM) format” Ex: 201105
The end date should be greater than start date.
Now we... (3 Replies)
Discussion started by: suresh01_apk
3 Replies
3. Shell Programming and Scripting
Hi All,
Want to get all dates and Julian week number for that date between the start date and end date. How can I achive this using perl?
(To achive above functionality, I was connecting to the database from DB server. Need to execute the same script in application server, since databse... (6 Replies)
Discussion started by: Nagaraja Akkiva
6 Replies
4. Shell Programming and Scripting
Hi All,
what i want to do in perl is i should give the date at run time .Suppose date given is 23/12/2011(mm/dd/yyyy) the perl script shold find week start date, week end date, previous week start date,end date,next week start date, end date. In this case
week start date will be-:12/19/2011... (2 Replies)
Discussion started by: parthmittal2007
2 Replies
5. Shell Programming and Scripting
Hi guys,
I am having the below logfile,date in yyyy-mm-dd
2013-08-02 *some content*
2013-08-02 *some content*
2013-08-02 *some content*
2013-08-03 *some content*
2013-08-05 *some content*
from the above logfile i need to get the lines between the two timestamps,if i give... (5 Replies)
Discussion started by: mohanalakshmi
5 Replies
6. UNIX for Dummies Questions & Answers
Dear all,
I have an user passing 2 parameter 31/03/2015 and 02/04/2015 to a ksh script. How to print the start date to end date.
Expected output is :
31/03/2015
01/04/2015
02/04/2015
Note :
1. Im using aix and ksh
2. I have tried to convert the given input into a date, didnt... (0 Replies)
Discussion started by: mr.rajaravi
0 Replies
7. UNIX for Beginners Questions & Answers
Below are my custom period start and end dates based on a calender, these dates are placed in a file, for each period i need to split into three weeks for each period row, example is given below.
Could you please help out to achieve solution through shell script..
File content:
... (2 Replies)
Discussion started by: nani2019
2 Replies
LEARN ABOUT DEBIAN
iso8601
PACEMAKER(8) System Administration Utilities PACEMAKER(8)
NAME
Pacemaker - Part of the Pacemaker cluster resource manager
SYNOPSIS
iso8601 command [output modifier]
DESCRIPTION
iso8601 - Display and parse ISO8601 dates and times
OPTIONS
-?, --help
This text
-$, --version
Version information
-V, --verbose
Increase debug output
Commands:
-n, --now
Display the current date/time
-d, --date=value
Parse an ISO8601 date/time. Eg. '2005-01-20 00:30:00 +01:00' or '2005-040'
-p, --period=value
Parse an ISO8601 date/time with interval/period (wth start time). Eg. '2005-040/2005-043'
-D, --duration=value
Parse an ISO8601 date/time with duration (wth start time). Eg. '2005-040/P1M'
Output Modifiers:
-L, --local
Show result as a 'local' date/time
-O, --ordinal
Show result as an 'ordinal' date/time
-W, --week
Show result as an 'calendar week' date/time
For more information on the ISO8601 standard, see: http://en.wikipedia.org/wiki/ISO_8601
AUTHOR
Written by Andrew Beekhof
REPORTING BUGS
Report bugs to pacemaker@oss.clusterlabs.org
Pacemaker 1.1.7 April 2012 PACEMAKER(8)