04-13-2011
Autosys Job Running every 5th Day of Month
Hi,
Is there a way to schedule a job in Autosys to run every 5th Day of Month without using custom calendar?
Thanks.
10 More Discussions You Might Find Interesting
1. Shell Programming and Scripting
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (0 Replies)
Discussion started by: rgilan01
0 Replies
2. Programming
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (0 Replies)
Discussion started by: rgilan01
0 Replies
3. Solaris
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (2 Replies)
Discussion started by: rgilan01
2 Replies
4. UNIX for Advanced & Expert Users
I am looking to get a report on autosys jobs in RUNNING state b/w certain time frame (timeA and timeB).
What I am after is the list of all the jobs that ran between AND during timeA and timeB.
Jobs within the timeframe could either:
A: STARTING --> RUNNING --> SUCCESS/FAILURE etc..
B: ... (1 Reply)
Discussion started by: rgilan01
1 Replies
5. Windows & DOS: Issues & Discussions
Hi, I have created an autosys job which calls an exe and updates its output files. The job is failing without updating the output and error files.
I if restart the usvmapgrnd01.pc.ml.com machine, the job runs successful for first time and fails rest of the time. Please let me know what might be... (0 Replies)
Discussion started by: sonaldewle
0 Replies
6. Shell Programming and Scripting
Below is the requirement i am trying to do using auto sysjob.
I need to create a JOB or script which will do the below things for me
I have a box and there corresponding jobs as below
BOX_1
JOB_1
JOB_2
BOX_2--- SU(JOB_2), this will run only on completion (Success) of JOB_2
... (2 Replies)
Discussion started by: j_panky
2 Replies
7. Shell Programming and Scripting
Hello Experts/Guru,
I need a help in running the script on every month last day....
PS: due to some constrain I can't schedule in crontab
Requirement:
On Jan 31st i want to run some script, similarly on Feb 28th, March 31st, April 30th......till Dec 31st.
Please help me by providing... (3 Replies)
Discussion started by: aks_1902
3 Replies
8. UNIX for Dummies Questions & Answers
Hello Guys,
I have a questions regarding running a shell script every second working day each month.
I have no clue how solve this problem :wall:.
Important is that it has to be the second working (Mo-Fr).
Example: If 1st and 2nd Days of month are Sat and Sun the script must run on 4th day... (5 Replies)
Discussion started by: Hollo
5 Replies
9. UNIX for Advanced & Expert Users
Hi Experts,
I am new to Autosys. I created a Autosys box job to run at 10 AM daily. As scheduled, the job starts on time.
There is another box job inside the box. I have scheduled it to run at 11 AM but it kicks off automatically with the main job at 10 AM.
insert_job: Main-job ... (2 Replies)
Discussion started by: pk_bohra
2 Replies
10. Solaris
Hi All,
We run Many jobs evryday using Autosys. Sometimes due to various reason we got to run the job from terminal as well (using nohup).
We observed that the job running through terminal(nohup) takes much less time then the autosys (for same job).
What can be the possible reason for such... (1 Reply)
Discussion started by: kg_gaurav
1 Replies
LEARN ABOUT HPUX
calendar
calendar(1) General Commands Manual calendar(1)
NAME
calendar - reminder service
SYNOPSIS
DESCRIPTION
consults the file in the current directory and prints out lines containing today's or tomorrow's date anywhere in the line. On weekends,
``tomorrow'' extends through Monday.
When a command-line argument is present, searches for the file in each user's home directory, and sends any positive results to the user by
(see mail(1)). Normally this is done daily in the early morning hours under the control of (see cron(1M)). When invoked by reads the
first line in the file to determine the user's environment.
Language-dependent information such as spelling and date format (described below) are determined by the user-specified statement in the
file. This statement should be of the form where language is a valid language name (see lang(5)). If this line is not in the file, the
action described in the section is taken.
is concerned with two fields: month and day. A month field can be expressed in three different formats: a string representing the name of
the month (either fully spelled out or abbreviated), a numeric month, or an asterisk (representing any month). If the month is expressed
as a string representing the name of the month, the first character can be either upper-case or lower-case; other characters must be lower-
case. The spelling of a month name should match the string returned by calling (see nl_langinfo(3C)). The day field is a numeric value
for the day of the month.
Month-Day Formats
If the month field is a string, it can be followed by zero or more blanks. If the month field is numeric, it must be followed by either a
slash or a hyphen If the month field is an asterisk it must be followed by a slash The day field can be followed immediately by a blank or
non-digit character.
Day-Month Formats
The day field is expressed as a numeral. What follows the day field is determined by the format of the month. If the month field is a
string, the day field must be followed by zero or one dot followed by zero or more blanks. If the month field is a numeral, the day field
must be followed by either a slash or a hyphen If the month field is an asterisk, the day field must be followed by a slash
EXTERNAL INFLUENCES
Environment Variables
determines the format and contents of date and time strings when no statement is specified in the file.
determines the language in which messages are displayed.
If is not specified in the environment or is set to the empty string, the value of is used as a default for each unspecified or empty vari-
able. If is not specified or is set to the empty string, a default of "C" (see lang(5)) is used instead of If any internationalization
variable contains an invalid setting, behaves as if all internationalization variables are set to "C". See environ(5).
International Code Set Support
Single- and multi-byte character code sets are supported.
EXAMPLES
The following file illustrates several formats recognized by calendar:
In the following file, dates are expressed according to European English usage:
WARNINGS
To get reminder service, either your calendar must be public information or you must run from your personal file, independent of any run
systemwide. Note that if you run yourself, the calendar file need not reside in your home directory.
extended idea of ``tomorrow'' does not account for holidays.
This command is likely to be withdrawn from X/Open standards. Applications using this command might not be portable to other vendors'
platforms.
AUTHOR
was developed by AT&T and HP.
FILES
to figure out today's and tomorrow's dates
SEE ALSO
cron(1M), nl_langinfo(3C), mail(1), environ(5).
STANDARDS CONFORMANCE
calendar(1)