Sponsored Content
Contact Us Post Here to Contact Site Administrators and Moderators Broken link FAQ date arithmetic with shell Post 302465968 by Neo on Monday 25th of October 2010 04:18:36 AM
Old 10-25-2010
Thanks.

Removed out-of-date (dead) link, as advised:

https://www.unix.com/answers-frequent...rithmetic.html
 

9 More Discussions You Might Find Interesting

1. Shell Programming and Scripting

How to perform arithmetic operation on date

Hi all, I would appreciate if anyone knows how to perform adding to date. As for normal date, i can easily plus with any number. But when it comes to month end say for example 28 Jun, i need to perform a plus with number 3, it will not return 1 Jul. Thanks in advance for your help. (4 Replies)
Discussion started by: agathaeleanor
4 Replies

2. Fedora

Simple arithmetic in shell

Hey, I just wanted to know how one can write simple arithmetic like addition, subtraction, multiplication and division in shell-script. (14 Replies)
Discussion started by: #moveon
14 Replies

3. Shell Programming and Scripting

Date and time Arithmetic

Hi, I need to process a file which contains below data. Usually the files contains both Start and Finish time. but for Few records, it contains only Start. For those records I need to add the finish line by adding 5 minutes to Start time. Started BBIDX Tue Jun 1 15:15:11 EDT 2010 292308... (1 Reply)
Discussion started by: siba.s.nayak
1 Replies

4. Post Here to Contact Site Administrators and Moderators

Broken Links in the Site Link Directory

(split from another thread) Hi. Can you please post a copy of the exact link you used? I have no trouble accessing either the readme, or the link to "Featured Books and Articles by Active Forum Members - Links" Thanks. (2 Replies)
Discussion started by: Scott
2 Replies

5. Post Here to Contact Site Administrators and Moderators

Dead link in FAQ

Dead link from FAQ, then Technical FAQ: Senior Advisor - https://www.unix.com (Was about to suggest that a O/P read this FAQ). (9 Replies)
Discussion started by: methyl
9 Replies

6. Shell Programming and Scripting

Help needed with some date arithmetic

I have a file (main.lst) containing a list of dates in DDMMYYYY format. The dates will mostly be the same but it is possible to have multiple dates and these need not be in chronological order. I have another file containing another list of dates (holidays.lst). The task is to get the latest... (5 Replies)
Discussion started by: elixir_sinari
5 Replies

7. Web Development

Broken Link-Checking software/utility

Hi all - I work for an organization that maintains 40 web sites, which run on a UNIX box. We're looking for software that can sit on the UNIX box and check for broken links/orphans on all of our sites....we'd like to schedule it to run nightly and produce a report....anyone know of something that... (1 Reply)
Discussion started by: dcasteve
1 Replies

8. Red Hat

Print Date when Broken Pipe happens

Hi all, as i have multiple broken pipes on ssh sessions, i need to find out after how much time it happens, ssh root@testServer root@testServer's password: ssh:notty Last login: Thu Apr 6 06:41:16 2017 from 10.10.10.2 # but when broke pipe happen i don't have any idea after how much... (3 Replies)
Discussion started by: charli1
3 Replies

9. Shell Programming and Scripting

Need help with date arithmetic please

Hello fellow forum members, I wrote below piece of code to calculate the date after a given date - date=$DATE_FINAL declare -a max_month=(0 31 28 31 30 31 30 31 31 30 31 30 31) eval $(echo $date|sed 's!\(....\)\(..\)\(..\)!year=\1;month=\2;day=\3!') (( year4=year%4 )) (( year100=year%100... (9 Replies)
Discussion started by: ektubbe
9 Replies
CALENDAR(3)						   BSD Library Functions Manual 					       CALENDAR(3)

NAME
easterg, easterog, easteroj, gdate, jdate, ndaysg, ndaysj, week, weekday -- Calendar arithmetic for the Christian era LIBRARY
Calendar Arithmetic Library (libcalendar, -lcalendar) SYNOPSIS
#include <calendar.h> struct date * easterg(int year, struct date *dt); struct date * easterog(int year, struct date *dt); struct date * easteroj(int year, struct date *dt); struct date * gdate(int nd, struct date *dt); struct date * jdate(int nd, struct date *dt); int ndaysg(struct date *dt); int ndaysj(struct date *dt); int week(int nd, int *year); int weekday(int nd); DESCRIPTION
These functions provide calendar arithmetic for a large range of years, starting at March 1st, year zero (i.e., 1 B.C.) and ending way beyond year 100000. Programs should be linked with -lcalendar. The functions easterg(), easterog() and easteroj() store the date of Easter Sunday into the structure pointed at by dt and return a pointer to this structure. The function easterg() assumes Gregorian Calendar (adopted by most western churches after 1582) and the functions easterog() and easteroj() compute the date of Easter Sunday according to the orthodox rules (Western churches before 1582, Greek and Russian Orthodox Church until today). The result returned by easterog() is the date in Gregorian Calendar, whereas easteroj() returns the date in Julian Calendar. The functions gdate(), jdate(), ndaysg() and ndaysj() provide conversions between the common "year, month, day" notation of a date and the "number of days" representation, which is better suited for calculations. The days are numbered from March 1st year 1 B.C., starting with zero, so the number of a day gives the number of days since March 1st, year 1 B.C. The conversions work for nonnegative day numbers only. The gdate() and jdate() functions store the date corresponding to the day number nd into the structure pointed at by dt and return a pointer to this structure. The ndaysg() and ndaysj() functions return the day number of the date pointed at by dt. The gdate() and ndaysg() functions assume Gregorian Calendar after October 4, 1582 and Julian Calendar before, whereas jdate() and ndaysj() assume Julian Calendar throughout. The two calendars differ by the definition of the leap year. The Julian Calendar says every year that is a multiple of four is a leap year. The Gregorian Calendar excludes years that are multiples of 100 and not multiples of 400. This means the years 1700, 1800, 1900, 2100 are not leap years and the year 2000 is a leap year. The new rules were inaugurated on October 4, 1582 by deleting ten days following this date. Most catholic countries adopted the new calendar by the end of the 16th century, whereas others stayed with the Julian Calendar until the 20th century. The United Kingdom and their colonies switched on September 2, 1752. They already had to delete 11 days. The function week() returns the number of the week which contains the day numbered nd. The argument *year is set with the year that contains (the greater part of) the week. The weeks are numbered per year starting with week 1, which is the first week in a year that includes more than three days of the year. Weeks start on Monday. This function is defined for Gregorian Calendar only. The function weekday() returns the weekday (Mo = 0 .. Su = 6) of the day numbered nd. The structure date is defined in <calendar.h>. It contains these fields: int y; /* year (0000 - ????) */ int m; /* month (1 - 12) */ int d; /* day of month (1 - 31) */ The year zero is written as "1 B.C." by historians and "0" by astronomers and in this library. SEE ALSO
ncal(1), strftime(3) STANDARDS
The week number conforms to ISO 8601: 1988. HISTORY
The calendar library first appeared in FreeBSD 3.0. AUTHORS
This manual page and the library was written by Wolfgang Helbig <helbig@FreeBSD.org>. BUGS
The library was coded with great care so there are no bugs left. BSD
November 29, 1997 BSD
All times are GMT -4. The time now is 09:40 AM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy