Hi
I need to produce a report that the start date must be the first day of the current quarter. Therefore a repor that is run today the start date would be 01/10/2010 (ddmmyyyy).
Obvioulsy I could hard code this date in but what happens when the report is run in January the start of the... (6 Replies)
Hi All,
I enter Start date and end date as parameters. I need to capture dates between start date and end date. Please let me know if you have any idea the same.
Thanks in advance.
Nagaraja Akkivalli. (5 Replies)
Hi All,
Want to get all dates and Julian week number for that date between the start date and end date. How can I achive this using perl?
(To achive above functionality, I was connecting to the database from DB server. Need to execute the same script in application server, since databse... (6 Replies)
In KSH, I am pasting 2 almost identical files together and each one has a date and time on each line. I need to determine if the first instance of the date/time is greater than the 2nd instance of the date/time. If the first instance is greater, I just need to echo that line.
I thought I would... (4 Replies)
Dear Members,
Depending on the current date i should find out the start and end dates of the quarter.
ex: Today date is 14-Nov-2011 then Quarter start date should be Oct 1 2011 and Quarter End date should be Dec 31 2011.
How can i do this?
Thanks
Sandeep (1 Reply)
Hi ,
I need to trigger few jobs based on the system date ( in case user is not passing any date to the script. In case passing then need to take the user date).
Here is the requirement
1. Everyday call daily script
2. On 1st day of week call weekly script
3. On 1st day of month call... (4 Replies)
Dear all,
I have an user passing 2 parameter 31/03/2015 and 02/04/2015 to a ksh script. How to print the start date to end date.
Expected output is :
31/03/2015
01/04/2015
02/04/2015
Note :
1. Im using aix and ksh
2. I have tried to convert the given input into a date, didnt... (0 Replies)
Below are my custom period start and end dates based on a calender, these dates are placed in a file, for each period i need to split into three weeks for each period row, example is given below.
Could you please help out to achieve solution through shell script..
File content:
... (2 Replies)
Discussion started by: nani2019
2 Replies
LEARN ABOUT DEBIAN
soap::wsdl::expat::messageparser
SOAP::WSDL::Expat::MessageParser(3pm) User Contributed Perl Documentation SOAP::WSDL::Expat::MessageParser(3pm)NAME
SOAP::WSDL::Expat::MessageParser - Convert SOAP messages to custom object trees
SYNOPSIS
my $parser = SOAP::WSDL::Expat::MessageParser->new({
class_resolver => 'My::Resolver'
});
$parser->parse( $xml );
my $obj = $parser->get_data();
DESCRIPTION
Real fast expat based SOAP message parser.
See SOAP::WSDL::Manual::Parser for details.
Skipping unwanted items
Sometimes there's unnecessary information transported in SOAP messages.
To skip XML nodes (including all child nodes), just edit the type map for the message, set the type map entry to '__SKIP__', and comment
out all child elements you want to skip.
Bugs and Limitations
o Ignores all namespaces
o Does not handle mixed content
o The SOAP header is ignored
AUTHOR
Replace the whitespace by @ for E-Mail Address.
Martin Kutter E<lt>martin.kutter fen-net.deE<gt>
LICENSE AND COPYRIGHT
Copyright 2004-2007 Martin Kutter.
This file is part of SOAP-WSDL. You may distribute/modify it under the same terms as perl itself
Repository information
$Id: MessageParser.pm 851 2009-05-15 22:45:18Z kutterma $
$LastChangedDate: 2009-05-16 00:45:18 +0200 (Sa, 16. Mai 2009) $
$LastChangedRevision: 851 $
$LastChangedBy: kutterma $
$HeadURL: https://soap-wsdl.svn.sourceforge.net/svnroot/soap-wsdl/SOAP-WSDL/trunk/lib/SOAP/WSDL/Expat/MessageParser.pm $
perl v5.10.1 2010-12-21 SOAP::WSDL::Expat::MessageParser(3pm)