i have a variable in which i am giving date as user input
a=20090728
How can i addd or substract no of days from that date and get the required day.
lets say if i will add 4 days it should show 20090801
...
Hi all,
I've used various scripts in the past to work out the date last week from the current date, however I now have a need to work out the date 1 week from a given date.
So for example, if I have a date of the 23rd July 2010, I would like a script that can work out that one week back was... (4 Replies)
Hello gurus,
I am hoping someone can help me with the required code/script to make this work. I have the following file with records starting at line 4:
NETW~US60~000000000013220694~002~~IT~USD~2.24~20110201~99991231~01~01~20101104~... (4 Replies)
hi there
I have file names in different format as below
triss_20111117_fxcb.csv
triss_fxcb_20111117.csv
xpnl_hypo_reu_miplvdone_11172011.csv
xpnl_hypo_reu_miplvdone_11-17-2011.csv
xpnl_hypo_reu_miplvdone_20111117.csv
xpnl_hypo_reu_miplvdone_20111117xfb.csv... (10 Replies)
Hi,
In a field, I should receive the date with time stamp in a particular field. But sometimes the vendor sends just the date or the timestamp or correctl the date×tamp. I have to figure out the the data is a date or time stamp or date×tamp.
If it is date then append "<space>00:00:00"... (1 Reply)
Dear all,
I have 2 questions.
I have a file with many rows which has date of the format YYYYMMDD.
1. I need to change the date to that weeks friday date(Ex: 20120716(monday) to 20120720). Satuday/Sunday has to be changed to next week friday date too.
2. After converting the date to... (10 Replies)
I have file listed like below
-rw-r--r--+ 1 test test 17M Nov 26 14:43 test1.gz
-rw-r--r--+ 1 test test 0 Nov 26 14:44 test2.gz
-rw-r--r--+ 1 test test 0 Nov 27 10:41 test3.gz
-rw-r--r--+ 1 test test 244K Nov 27 10:41 test4.gz
-rw-r--r--+ 1 test test 17M Nov 27 10:41 test5.gz
I... (5 Replies)
i try to set linux date & time in specific format but it keep giving me error
Example :
date "+%d-%m-%C%y %H:%M:%S" -d "19-01-2017 00:05:01"
or
date +"%d-%m-%C%y %H:%M:%S" -d "19-01-2017 00:05:01"
keep giving me this error :
date: invalid date ‘19-01-2017 00:05:01'
Please use CODE tags... (7 Replies)
Can someone help me with the code wherein there is a file f1.txt with different column and 34 column have expiry date and I need to get that and compare with system date and if expiry date is <system date remove those rows and other rows should be moved to new file f2.txt .
I don't want to delete... (2 Replies)
I m working on shell scripting and I m stuck where in my .txt file there is column as expiry date and I need to compare that date with system date and need to remove all the rows where expiry date is less than system date and create a new .txt with update. (1 Reply)
Hi,
My question is how to calculate the quarter end date according to the current date in shell script? (2 Replies)
Discussion started by: Divya_1234
2 Replies
LEARN ABOUT FREEBSD
ndaysg
CALENDAR(3) BSD Library Functions Manual CALENDAR(3)NAME
easterg, easterog, easteroj, gdate, jdate, ndaysg, ndaysj, week, weekday -- Calendar arithmetic for the Christian era
LIBRARY
Calendar Arithmetic Library (libcalendar, -lcalendar)
SYNOPSIS
#include <calendar.h>
struct date *
easterg(int year, struct date *dt);
struct date *
easterog(int year, struct date *dt);
struct date *
easteroj(int year, struct date *dt);
struct date *
gdate(int nd, struct date *dt);
struct date *
jdate(int nd, struct date *dt);
int
ndaysg(struct date *dt);
int
ndaysj(struct date *dt);
int
week(int nd, int *year);
int
weekday(int nd);
DESCRIPTION
These functions provide calendar arithmetic for a large range of years, starting at March 1st, year zero (i.e., 1 B.C.) and ending way beyond
year 100000.
Programs should be linked with -lcalendar.
The functions easterg(), easterog() and easteroj() store the date of Easter Sunday into the structure pointed at by dt and return a pointer
to this structure. The function easterg() assumes Gregorian Calendar (adopted by most western churches after 1582) and the functions
easterog() and easteroj() compute the date of Easter Sunday according to the orthodox rules (Western churches before 1582, Greek and Russian
Orthodox Church until today). The result returned by easterog() is the date in Gregorian Calendar, whereas easteroj() returns the date in
Julian Calendar.
The functions gdate(), jdate(), ndaysg() and ndaysj() provide conversions between the common "year, month, day" notation of a date and the
"number of days" representation, which is better suited for calculations. The days are numbered from March 1st year 1 B.C., starting with
zero, so the number of a day gives the number of days since March 1st, year 1 B.C. The conversions work for nonnegative day numbers only.
The gdate() and jdate() functions store the date corresponding to the day number nd into the structure pointed at by dt and return a pointer
to this structure.
The ndaysg() and ndaysj() functions return the day number of the date pointed at by dt.
The gdate() and ndaysg() functions assume Gregorian Calendar after October 4, 1582 and Julian Calendar before, whereas jdate() and ndaysj()
assume Julian Calendar throughout.
The two calendars differ by the definition of the leap year. The Julian Calendar says every year that is a multiple of four is a leap year.
The Gregorian Calendar excludes years that are multiples of 100 and not multiples of 400. This means the years 1700, 1800, 1900, 2100 are
not leap years and the year 2000 is a leap year. The new rules were inaugurated on October 4, 1582 by deleting ten days following this date.
Most catholic countries adopted the new calendar by the end of the 16th century, whereas others stayed with the Julian Calendar until the
20th century. The United Kingdom and their colonies switched on September 2, 1752. They already had to delete 11 days.
The function week() returns the number of the week which contains the day numbered nd. The argument *year is set with the year that contains
(the greater part of) the week. The weeks are numbered per year starting with week 1, which is the first week in a year that includes more
than three days of the year. Weeks start on Monday. This function is defined for Gregorian Calendar only.
The function weekday() returns the weekday (Mo = 0 .. Su = 6) of the day numbered nd.
The structure date is defined in <calendar.h>. It contains these fields:
int y; /* year (0000 - ????) */
int m; /* month (1 - 12) */
int d; /* day of month (1 - 31) */
The year zero is written as "1 B.C." by historians and "0" by astronomers and in this library.
SEE ALSO ncal(1), strftime(3)STANDARDS
The week number conforms to ISO 8601: 1988.
HISTORY
The calendar library first appeared in FreeBSD 3.0.
AUTHORS
This manual page and the library was written by Wolfgang Helbig <helbig@FreeBSD.org>.
BUGS
The library was coded with great care so there are no bugs left.