There's a built in gui for building calendars in autosys. You start it with this command:

autocal &

You can hack through it to generate your calendar. The you add:

run_calendar: My_calendar

to you jil file. I would suggest looking through an autosys manual or some already built jil scripts. It's pretty easy.
 

10 More Discussions You Might Find Interesting

1. Shell Programming and Scripting

Job Scheduling

Hello, I want to know about job scheduling utilities available in unix. It should not be responsible just for starting the job like in case of cron but should also be able to handle the execution of jobs. Regards, Ritesh (1 Reply)
Discussion started by: turlapaty
1 Replies

2. UNIX for Advanced & Expert Users

Documentation and books on Autosys Job Control Tool from Autosys

My project uses Autosys. I am new to this product and I don't know where to start from. Q1. Please provide me the link where I can get Autosys documentation Q2. Please refer a good book on Autosys. (Beginner/Intermediate Level) (0 Replies)
Discussion started by: gram77
0 Replies

3. UNIX and Linux Applications

Job Scheduling

I am working on UNIX AIX system, with Oracle OS. We are not supposed to use any tools to schedule our unix shell scripts. Basically we have to make use of Oracle tables and Shell scripts to manage dependencies, restartability, scheduling, parallelizing,etc. If anyone has worked/ is working... (1 Reply)
Discussion started by: singhabhijit
1 Replies

4. Shell Programming and Scripting

Job Scheduling

I am working on UNIX AIX system, with Oracle OS. We are not supposed to use any tools to schedule our unix shell scripts. Basically we have to make use of Oracle tables and Shell scripts to manage dependencies, restartability, scheduling, parallelizing,etc. If anyone has worked/ is working... (4 Replies)
Discussion started by: singhabhijit
4 Replies

5. UNIX and Linux Applications

Job Scheduling (Autosys)

Hello! I will be working with Autosys and I am looking for individuals that have knowledge of this UNIX application. Thank-you! (3 Replies)
Discussion started by: preshe79
3 Replies

6. Shell Programming and Scripting

autosys job configuration for job failure.

We need to configure autosys that when a job fails continously for 3 times, we need to call another job. Is this possible in Autosys, or can anyone advice on the alternative. (2 Replies)
Discussion started by: sangea
2 Replies

7. Shell Programming and Scripting

Autosys job scheduling on specific day

Below is the requirement i am trying to do using auto sysjob. I need to create a JOB or script which will do the below things for me I have a box and there corresponding jobs as below BOX_1 JOB_1 JOB_2 BOX_2--- SU(JOB_2), this will run only on completion (Success) of JOB_2 ... (2 Replies)
Discussion started by: j_panky
2 Replies

8. Shell Programming and Scripting

Job Scheduling

Hi All, I am new to unix and i have a task in front of me. The code part is "android update sdk" . I need to crontab this process. Hence i have written a script that runs the above command and sends a mail once the update is done. The problem with the automation is the installer asks for a... (5 Replies)
Discussion started by: Kashyap
5 Replies

9. UNIX for Advanced & Expert Users

Autosys Job: Job did not start

I have submitted an autosys job and force start it. Autosys hit the job 4 times to restart but it did not start and finally I terminate the job. Any idea why the job did not start. Below is the code I executed. 1214 missun0ap /export/home/bzn97r/develop/dswi/jil$ sendevent -E FORCE_STARTJOB... (0 Replies)
Discussion started by: jnrohit2k
0 Replies

10. Shell Programming and Scripting

Autosys job scheduling issue,

Hi Friends, There is an Autosys scheduled job that runs on the second day of the month, and it is using the Business day calendar. So when the month starts on a weekend or there is a holiday at the beginning of the month the second business day and second day of the month obviously do not... (1 Reply)
Discussion started by: Aditya_001
1 Replies
libecal-1.2(3)							   User Commands						    libecal-1.2(3)

NAME
libecal-1.2, libedata-cal-1.2 - calendar library, calendar backend library DESCRIPTION
libecal-1.2 is the main client library for calendars and tasks. It provides all the interfaces are necessary for client applications to access and manage calendars and tasks. libedata-cal-1.2 provides APIs for calendar backend and implements the calendar CORBA interfaces. ATTRIBUTES
See attributes(5) for descriptions of the following attributes: +-----------------------------+-----------------------------+ | ATTRIBUTE TYPE | ATTRIBUTE VALUE | +-----------------------------+-----------------------------+ |Availability |SUNWevolution-data-server | +-----------------------------+-----------------------------+ |Interface stability |Private | +-----------------------------+-----------------------------+ SEE ALSO
evolution(1), libebook(3), libedataserver(3), attributes(5), gnome-interfaces(5) NOTES
Sun does not guarantee the stability of these interfaces and does not recommend their use. API documentation for these interfaces is pro- vided by the Evolution free software community for those who wish to develop using these interfaces. While if you want to get more infor- mation, you can visit: http://www.gnome.org/projects/evolution/developer-doc/libecal/index.html or http://www.gnome.org/projects/evolution/devel- oper-doc/libedata-cal/index.html Written by Nancy Cai, Sun Microsystems Inc., 2006. SunOS 5.11 11 Oct 2006 libecal-1.2(3)
All times are GMT -4. The time now is 01:20 PM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy