04-17-2009
Autosys job scheduling
Hi,
I want to schedule a job through Autosys (in Linux server) to run on 1st day of every 3rd month(gap of 90 days). Please someone help me to achive my above requirement
Example:
Run the sample.sh on 01-Jan-2009, 01-Apr-2009, 01-Jul-2009, 01-Oct-2009.
Thanks in advance
10 More Discussions You Might Find Interesting
1. Shell Programming and Scripting
Hello,
I want to know about job scheduling utilities available in unix. It should not be responsible just for starting the job like in case of cron but should also be able to handle the execution of jobs.
Regards,
Ritesh (1 Reply)
Discussion started by: turlapaty
1 Replies
2. UNIX for Advanced & Expert Users
My project uses Autosys.
I am new to this product and I don't know where to start from.
Q1. Please provide me the link where I can get Autosys documentation
Q2. Please refer a good book on Autosys. (Beginner/Intermediate Level) (0 Replies)
Discussion started by: gram77
0 Replies
3. UNIX and Linux Applications
I am working on UNIX AIX system, with Oracle OS.
We are not supposed to use any tools to schedule our unix shell scripts.
Basically we have to make use of Oracle tables and Shell scripts to manage dependencies, restartability, scheduling, parallelizing,etc.
If anyone has worked/ is working... (1 Reply)
Discussion started by: singhabhijit
1 Replies
4. Shell Programming and Scripting
I am working on UNIX AIX system, with Oracle OS.
We are not supposed to use any tools to schedule our unix shell scripts.
Basically we have to make use of Oracle tables and Shell scripts to manage dependencies, restartability, scheduling, parallelizing,etc.
If anyone has worked/ is working... (4 Replies)
Discussion started by: singhabhijit
4 Replies
5. UNIX and Linux Applications
Hello!
I will be working with Autosys and I am looking for individuals that have knowledge of this UNIX application.
Thank-you! (3 Replies)
Discussion started by: preshe79
3 Replies
6. Shell Programming and Scripting
We need to configure autosys that when a job fails continously for 3 times, we need to call another job.
Is this possible in Autosys, or can anyone advice on the alternative. (2 Replies)
Discussion started by: sangea
2 Replies
7. Shell Programming and Scripting
Below is the requirement i am trying to do using auto sysjob.
I need to create a JOB or script which will do the below things for me
I have a box and there corresponding jobs as below
BOX_1
JOB_1
JOB_2
BOX_2--- SU(JOB_2), this will run only on completion (Success) of JOB_2
... (2 Replies)
Discussion started by: j_panky
2 Replies
8. Shell Programming and Scripting
Hi All,
I am new to unix and i have a task in front of me.
The code part is "android update sdk" . I need to crontab this process.
Hence i have written a script that runs the above command and sends a mail once the update is done. The problem with the automation is the installer asks for a... (5 Replies)
Discussion started by: Kashyap
5 Replies
9. UNIX for Advanced & Expert Users
I have submitted an autosys job and force start it. Autosys hit the job 4 times to restart but it did not start and finally I terminate the job. Any idea why the job did not start. Below is the code I executed.
1214 missun0ap /export/home/bzn97r/develop/dswi/jil$ sendevent -E FORCE_STARTJOB... (0 Replies)
Discussion started by: jnrohit2k
0 Replies
10. Shell Programming and Scripting
Hi Friends,
There is an Autosys scheduled job that runs on the second day of the month, and it is using the Business day calendar.
So when the month starts on a weekend or there is a holiday at the beginning of the month the second business day and second day of the month obviously do not... (1 Reply)
Discussion started by: Aditya_001
1 Replies
CAL(1) BSD General Commands Manual CAL(1)
NAME
cal -- displays a calendar
SYNOPSIS
cal [-3hjry] [-A after] [-B before] [-d day-of-week] [-R reform-spec] [[month] year]
DESCRIPTION
cal displays a simple calendar. If arguments are not specified, the current month is displayed. The options are as follows:
-3 Same as ``-A 1 -B 1''.
-A after
Display after months after the specified month.
-B before
Display before months before the specified month.
-d day-of-week
Specifies the day of the week on which the calendar should start. Valid values are 0 through 6, presenting Sunday through Saturday,
inclusively. The default output starts on Sundays.
-h Highlight the current day, if present in the displayed calendar. If output is to a terminal, then the appropriate terminal sequences
are used, otherwise overstriking is used. If more than one -h is used and output is to a terminal, the current date will be high-
lighted in inverse video instead of bold.
-j Display Julian dates (days one-based, numbered from January 1).
-R reform-spec
Selects an alternate Gregorian reform point from the default of September 3rd, 1752. The reform-spec can be selected by one of the
built-in names (see NOTES for a list) or by a date of the form YYYY/MM/DD. The date and month may be omitted, provided that what is
specified uniquely selects a given built-in reform point. If an exact date is specified, then that date is taken to be the first
missing date of the Gregorian Reform to be applied.
-r Display the month in which the Gregorian Reform adjustment was applied, if no other month or year information is given. If used in
conjunction with -y, then the entire year is displayed.
-y Display a calendar for the current year.
If no parameters are specified, the current month's calendar is displayed. A single parameter specifies the year and optionally the month in
ISO format: ``cal 2007-12'' Two parameters denote the month (1 - 12) and year. Note that the century must be included in the year.
A year starts on Jan 1.
NOTES
In the USA and Great Britain the Gregorian Reformation occurred in 1752. By this time, most countries had recognized the reformation
(although a few did not recognize it until the 1900's.) Eleven days following September 2, 1752 were eliminated by the reformation, so the
calendar for that month is a bit unusual.
In view of the chaotic way the Gregorian calendar was adopted throughout the world in the years between 1582 and 1928 make sure to take into
account the date of the Gregorian Reformation in your region if you are checking a calendar for a very old date.
cal has a decent built-in list of Gregorian Reform dates and the names of the countries where the reform was adopted:
Italy Oct. 5, 1582 Denmark Feb. 19, 1700
Spain Oct. 5, 1582 Great Britain Sep. 3, 1752
Portugal Oct. 5, 1582 Sweden Feb. 18, 1753
Poland Oct. 5, 1582 Finland Feb. 18, 1753
France Dec. 12, 1582 Japan Dec. 20, 1872
Luxembourg Dec. 22, 1582 China Nov. 7, 1911
Netherlands Dec. 22, 1582 Bulgaria Apr. 1, 1916
Bavaria Oct. 6, 1583 U.S.S.R. Feb. 1, 1918
Austria Jan. 7, 1584 Serbia Jan. 19, 1919
Switzerland Jan. 12, 1584 Romania Jan. 19, 1919
Hungary Oct. 22, 1587 Greece Mar. 10, 1924
Germany Feb. 19, 1700 Turkey Dec. 19, 1925
Norway Feb. 19, 1700 Egypt Sep. 18, 1928
The country known as Great Britain can also be referred to as England since that has less letters and no spaces in it. This is meant only as
a measure of expediency, not as a possible slight to anyone involved.
HISTORY
A cal command appeared in Version 6 AT&T UNIX.
BSD