Sponsored Content
Full Discussion: Tough Times
The Lounge What is on Your Mind? Cartoons for Geeks Tough Times Post 302253821 by Linux Bot on Sunday 2nd of November 2008 08:20:06 PM
Old 11-02-2008
Tough Times

2008-11-03T02:02:00+01:00
Image



"Mossberg laments lack of bargain Mac in his Fall Guide" (Jason D. O'Grady) and "Another Week, Another 18,885 Layoffs" (TechCrunch).

Image Image Image Image
Image

Source...
 

7 More Discussions You Might Find Interesting

1. Shell Programming and Scripting

Seems the Shell Script is very tough

Guys plz respond. (1 Reply)
Discussion started by: prince_of_focus
1 Replies

2. Programming

Tough makefile question

At my company, we build some stuff using a makefile. While the makefile script is running, a developer may check in a newer version of a source file. The problem is, when we next run the make command, the target file isn't rebuilt, because the date of the target is after the dependency. Any... (1 Reply)
Discussion started by: mbbeaubi
1 Replies

3. UNIX for Advanced & Expert Users

Tough Substituion command

I have lines like: Mg2.qns W=0.175u Mg2.qpsb W=0.175u Mg4.qns W=0.175u Mg4.qpsb W=0.175u Which I need to become: Mg2.qns W=wmg2qns Mg2.qpsb W=wmg2qpsb Mg4.qns W=wmg4qns Mg4.qpsb W=wmg4qpsb To acheive this individually line by line I use a command like:... (3 Replies)
Discussion started by: ggggdddd
3 Replies

4. UNIX for Dummies Questions & Answers

tough parsing

I have a string as "Period= 20090531 Client Name= Clayton Lumbar Company Destination= MD" I want to parse the string and store it in 3 different variables. $period (should get value 20090531) $client (should get value "Clayton Lumbar company") $dest (should get value MD) How can I do... (3 Replies)
Discussion started by: paruthiveeran
3 Replies

5. Shell Programming and Scripting

A very tough exercise

hello everyone!:) I have an exercise which I think is difficult for beginner like me. Here is the exercise Create a shell script, which takes a directory as command line argument. Script displays ten first lines from every text file in that directory. After displaying the lines from the... (1 Reply)
Discussion started by: googlevn
1 Replies

6. Programming

Problem with implementing the times() function in C (struct tms times return zero/negative values)

Hello, i'm trying to implement the times() function and i'm programming in C. I'm using the "struct tms" structure which consists of the fields: The tms_utime structure member is the CPU time charged for the execution of user instructions of the calling process. The tms_stime structure... (1 Reply)
Discussion started by: g_p
1 Replies

7. IP Networking

This looks like a tough routing issue

Hi, The default gateway (172.17.220.1) cannot be pinged via the default interface bond0 (172.17.220.231), but can be pinged via interface eth1 (10.201.135.73). # ping -I eth1 172.17.220.1 PING 172.17.220.1 (172.17.220.1) from 10.201.135.73 eth1: 56(84) bytes of data. 64 bytes from... (4 Replies)
Discussion started by: aixlover
4 Replies
cron(1M)																  cron(1M)

NAME
cron - timed-job execution daemon SYNOPSIS
DESCRIPTION
executes commands at specified dates and times. Regularly scheduled commands can be specified according to instructions placed in files. Users can submit their own files with a command (see crontab(1)). Users can submit commands that are to be executed only once with an or command. Since never exits, it should be executed only once. This is best done by running from the initialization process with the startup script (see init(1M)). only establishes a schedule for files and or command files during process initialization and when it is notified by or that a file has been added, deleted, or modified. When executes a job, the job's user and group IDs are set to those of the user who submitted the job. Spring and Autumn Time Transitions On the days of daylight savings (summer) time transition (in time zones and countries where daylight savings time applies), schedules com- mands differently from normal. In the following description, an ambiguous time refers to an hour and minute that occurs twice in the same day because of a daylight sav- ings time transition (usually on a day during the Autumn season). A nonexistent time refers to an hour and minute that does not occur because of a daylight savings time transition (usually on a day during the Spring season). DST-shift refers to the offset that is applied to standard time to result in daylight savings time. This is normally one hour, but can be any combination of hours and minutes up to 23 hours and 59 minutes (see tztab(4)). When a command is specified to run at an ambiguous time, the command is executed only once at the occurrence of the ambiguous time. When a command is specified to run at a nonexistent time, the command is executed after the specified time by an amount of time equal to the DST-shift. When such an adjustment would conflict with another time specified to run the command, the command is run only once rather than running the command twice at the same time. Commands that are scheduled to run during all hours (there is a is in the hour field of the entry) are scheduled without any adjustment. EXTERNAL INFLUENCES
Environment Variables determines the language in which messages are displayed. If is not specified or is set to the empty string, it defaults to "C" (see lang(5)). If any internationalization variable contains an invalid setting, all internationalization variables default to "C" (see environ(5)). DIAGNOSTICS
A history of all actions taken by is recorded in EXAMPLES
The following examples assume that the time zone is In this time zone, the DST transition occurs one second before 2:00 a.m. and the DST- shift is 1 hour. Consider the following entries in a file: For the period of 1:00 a.m. to 4:00 a.m. on the days of DST transition, the results will be: Job Times Run in Fall Times Run in Spring ----------------------------------------------------- Job_1 01:00 MDT 01:00 MST Job_2 02:00 MDT 03:00 MDT Job_3 03:00 MST 03:00 MDT Job_4 04:00 MST 04:00 MDT Job_hourly 01:00 MDT 01:00 MST 02:00 MDT 02:00 MST 03:00 MST 03:00 MDT 04:00 MST 04:00 MDT Multiple_1 02:00 MDT 03:00 MST 03:00 MDT 04:00 MST 04:00 MDT Multiple_2 02:00 MDT 03:00 MDT 04:00 MST 04:00 MDT WARNINGS
In the Spring, when there is a nonexistent hour because of daylight savings time, a command that is scheduled to run multiple times during the nonexistent hour will only be run once. For example, a command scheduled to run at 2:00 and 2:30 a.m. in the time zone will only run at 3:00 a.m. The command that was scheduled at 2:30 a.m. will not be run at all, instead of running at 3:30 a.m. DEPENDENCIES
HP Process Resource Manager If the optional HP Process Resource Management (PRM) software is installed and configured, jobs are launched in the initial process resource group of the user that scheduled the job. The user's initial group is determined at the time the job is started, not when the job is scheduled. If the user's initial group is not defined, the job runs in the user default group See prmconfig(1) for a description of how to configure HP PRM, and prmconf(4) for a description of how the user's initial process resource group is determined. AUTHOR
was developed by AT&T and HP. FILES
Main directory Directory containing and job files Directory containing files Accounting information SEE ALSO
at(1), crontab(1), sh(1), init(1M), queuedefs(4), tztab(4). HP Process Resource Manager: prmconfig(1), prmconf(4) in STANDARDS CONFORMANCE
cron(1M)
All times are GMT -4. The time now is 02:07 AM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy