Sponsored Content
Full Discussion: upgrade 5.2 to 5.3
Operating Systems AIX upgrade 5.2 to 5.3 Post 302196708 by sysgate on Monday 19th of May 2008 08:24:04 AM
Old 05-19-2008
I think it has to be done with "smit update_all" command, but I can't be sure, you should contact IBM tech support asking for this. Upgrade of the core OS may be tricky task, depending on your setup and/or installed packages.
 

4 More Discussions You Might Find Interesting

1. Solaris

help for Upgrade

hi administrator i need help to find solution for this . i have sun fire v880 server with configuration metioned below sun fire v880 2*750 MHz UltraSPARC 111 with 4 GB Memory ( 256*16 ) 36*6 GB hard disks( Internal) with other configuration and now i need to upgrade this server.... (3 Replies)
Discussion started by: dhasanka
3 Replies

2. AIX

OS upgrade

Hello, fellows: I have an old H80 with AIX 4.3, I want to upgrade to AIX 5.3, is this possible? I have read in some documentation that is necesary do it version to version, I mean... 4.3->5.1 5.1->5.2 5.2->5.3, anybody have this experience? I will aprecciate yor help. Kind regards. (2 Replies)
Discussion started by: GEIER
2 Replies

3. Red Hat

Upgrade

Dear all, Requirement: Upgrade RHEL 3 to RHEL 5. Question: How to plan the upgrade? Present state: Know that there is no direct upgrade path visible. And RH does not support direct upgrade. H/W: HP Proliant DL 380 G4 TIA (1 Reply)
Discussion started by: earlysame55
1 Replies

4. Red Hat

Upgrade from OL 6.3 to 6.5

Hello, For upgrading from OL 6.3 to 6.5 is this possible to upgrade without rebuild? What should be the generic steps in migration to OL 6.5. IS this like building up from scratch ? Best regards, Vishal (4 Replies)
Discussion started by: admin_db
4 Replies
All times are GMT -4. The time now is 12:32 AM.
Unix & Linux Forums Content Copyright 1993-2022. All Rights Reserved.
Privacy Policy