06-06-2002
Working out end time from start + elapsed
Hi,
I'm writing a script and have become stuck trying to define a variable (COMP) by adding an elapsed time (ELAPSE e.g 00:55) to a start time (START e.g 23:50).
Can anybody give me a solution as to how I can get a completion time in hh:mm from the variables above?
thanks
Richard
9 More Discussions You Might Find Interesting
1. Shell Programming and Scripting
Is there anyway to get the start time and end time / status of a crontab job which was just completed? Of course, we know the start time of the crontab job since we are scheduling. But I would like to know process start and time recorded somewhere or can be fetched from a command like 'ps'. ... (3 Replies)
Discussion started by: thambi
3 Replies
2. Shell Programming and Scripting
Hello All,
Below mentioned is my log file.
I want to make a script which ask for start time and then end time and then search particular word between those lines.
Like
start time:2
end time: 4
and then search all values starting from cell 84 between this time.
Please Help
... (2 Replies)
Discussion started by: wakhan
2 Replies
3. Shell Programming and Scripting
Hi,
Can anyone help me how can I get the line that between the start time and end time.
file1.txt
15/03/2009 20:45:03 Request: - Data of this line
15/03/2009 20:45:12 Response: - Data of this line
15/03/2009 22:10:40 Request: - Data of this line
15/03/2009 22:10:42 Response: - Data of... (1 Reply)
Discussion started by: tanit
1 Replies
4. UNIX for Dummies Questions & Answers
Hi All,
Can we get to know the start time and end time of execution of a script? (This script doesn't write any logs.) I mean, is there any built in process logs to track these records? (2 Replies)
Discussion started by: siba.s.nayak
2 Replies
5. Shell Programming and Scripting
Hi All,
I have 2 variables like SDATE and EDATE.
Now for example i ll give you values for the above 2 variables.
SDATE=11/08/09 11:22
EDATE=11/09/09 22:33
the values of the above variables are represented like this>>>>>> mm/dd/yy hh:mm Now I want to evaluate total time elapsed... (3 Replies)
Discussion started by: smarty86
3 Replies
6. Shell Programming and Scripting
Hello All,
I have a problem calculating the time difference between start and end timings...!
the timings are given by 24hr format..
Start Date : 08/05/10 12:55
End Date : 08/09/10 06:50
above values are in mm/dd/yy hh:mm format.
Now the thing is, 7th(08/07/10) and... (16 Replies)
Discussion started by: smarty86
16 Replies
7. UNIX for Dummies Questions & Answers
Hi guys,
How can I specify the start and end time of a cron job. And my start time and end time are specified by minutes. For example, I want to set up a cron runs every 3 minutes from 18:40 to midnight. How can i do this please? Many thanks
Best regards,
Clu (4 Replies)
Discussion started by: clu
4 Replies
8. Shell Programming and Scripting
Oracle Enterprise Linux
We want to track how long a process takes to complete its execution. This is what we want in the schell script
Before the process is started , get the time with date, hours and minutes
execute the process
After the process has ended , get the time with date,... (5 Replies)
Discussion started by: omega3
5 Replies
9. Programming
Dear team
I am using DB2 and wish to capture the ETL status on daily basis so that i can run the query and share the details in xls format to respective mail ids .
Currently i am using below query but this displays table name and counts for latest run.
select name ,CARD from... (0 Replies)
Discussion started by: Perlbaby
0 Replies
LEARN ABOUT DEBIAN
gr_plot_fft_f
GR_PLOT_FFT_F(1) User Commands GR_PLOT_FFT_F(1)
NAME
gr_plot_fft_f - plot complex binary data using GNU Radio
SYNOPSIS
gr_plot_fft_f: [options] input_filename
DESCRIPTION
Takes a GNU Radio complex binary file and displays the I&Q data versus time as well as the frequency domain (FFT) plot. The y-axis values
are plotted assuming volts as the amplitude of the I&Q streams and converted into dBm in the frequency domain (the 1/N power adjustment out
of the FFT is performed internally). The script plots a certain block of data at a time, specified on the command line as -B or --block.
This value defaults to 1000. The start position in the file can be set by specifying -s or --start and defaults to 0 (the start of the
file). By default, the system assumes a sample rate of 1, so in time, each sample is plotted versus the sample number. To set a true time
and frequency axis, set the sample rate (-R or --sample-rate) to the sample rate used when capturing the samples.
OPTIONS
-h, --help
show this help message and exit
-B BLOCK, --block=BLOCK
Specify the block size [default=1000]
-s START, --start=START
Specify where to start in the file [default=0]
-R SAMPLE_RATE, --sample-rate=SAMPLE_RATE
Set the sampler rate of the data [default=1.0]
SEE ALSO
gr_plot_char(1) gr_plot_const(1) gr_plot_fft_c(1) gr_plot_fft_f(1) gr_plot_float(1) gr_plot_int(1) gr_plot_iq(1) gr_plot_psd_c(1)
gr_plot_psd_f(1) gr_plot_qt(1) gr_plot_short(1)
gr_plot_fft_f 3.5 December 2011 GR_PLOT_FFT_F(1)