The UNIX and Linux Forums  

Go Back   The UNIX and Linux Forums > The Lounge > What's on Your Mind? > Chat with iBot - Our RSS Robot Girl
Google UNIX.COM
Home Forums Register Rules & FAQ Members List Arcade Search Today's Posts Mark Forums Read


Chat with iBot - Our RSS Robot Girl The Home of iBot, Our RSS Robot iBot. You can complain about RSS here :-)


Other UNIX.COM Threads You Might Find Helpful
Thread Thread Starter Forum Replies Last Post
Time Modified Issue Please Assist Emancipator HP-UX 1 03-13-2008 03:59 AM
Zones manoj.solaris SUN Solaris 2 08-30-2007 03:17 AM
Time issue on ultra 10 frustrated1 SUN Solaris 3 09-26-2005 07:02 AM
ntp across time zones Howeird UNIX for Advanced & Expert Users 5 04-11-2002 09:17 AM
time zones ldgriess UNIX for Dummies Questions & Answers 1 10-17-2001 07:16 AM

Reply
 
Submit Tools LinkBack Thread Tools Search this Thread Display Modes
  #1 (permalink)  
Old 09-01-2007
Registered User
 

Join Date: Dec 2006
Posts: 0
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiReddit! Stumble this Post!Spurl this Post!
Time issue with two different zones

Our city zone is Pacific standard time(PST). and our unix server time zone is GMT.
I am calling informatica job in unix script. Below is the steps in script.
1. Before starting the informatica job i get the datetime in startdate variable.
2. Calling the informatica configuration file which has the timezone as GMT.
3. Now the informatica job is called and upon the completion of Informatica job, I get the datetime in enddate variable.

This works fine in development environment. ie startdate and enddate variable values are in GMT timezone.
In Production the above unix script is called in Control M scheduler application which has the PST. The starttime variable is set to PST and enddate variable is set to GMT. so we were not able to get exact time difference. Is this due to the Control M scheduler timezone.
Control M and our login account are same. I checked in the production unix box time zone using TZ variable shows GMT timezone.
Pl help me to solve this issue.
Reply With Quote
Forum Sponsor
  #2 (permalink)  
Old 09-01-2007
Gollum's Avatar
Our Pet ForumBot
 

Join Date: Feb 2005
Posts: 64
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiReddit! Stumble this Post!Spurl this Post!
Time issue with two different zones

Quote:
Originally Posted by kirfan
Our city zone is Pacific standard time(PST). and our unix server time zone is GMT.
I am calling informatica job in unix script. Below is the steps in script.
1. Before starting the informatica job i get the datetime in startdate variable.
2. Calling the informatica configuration file which has the timezone as GMT.
3. Now the informatica job is called and upon the completion of Informatica job, I get the datetime in enddate variable.

This works fine in development environment. ie startdate and enddate variable values are in GMT timezone.
In Production the above unix script is called in Control M scheduler application which has the PST. The starttime variable is set to PST and enddate variable is set to GMT. so we were not able to get exact time difference. Is this due to the Control M scheduler timezone.
Control M and our login account are same. I checked in the production unix box time zone using TZ variable shows GMT timezone.
Pl help me to solve this issue.
It would be nice if our city zone is Pacific standard timePST.It would be nice if our unix server time zone is GMT.What is the phone number?Tell me more about steps in script.
Only one?What happened after starting the informatica job he or she get the datetime in startdate variable ?Two what?I never call the informatica configuration file which has the timezone as GMT, that would be impolite.Three what?Why now? Thanks for the info.What does "this" refer to?All of them?What is in Production the above unix script is called in Control M scheduler application which has the PST like in there? What is your real name?Uh. Was this something you planned?Yes I think this is due to the Control M scheduler timezone, but I'm not completely sure.I think there might be a few exception.Do you mind if I tell other people:
said checked in the production unix box time zone using TZ variable shows GMT timezone.
Tell me a story.
Reply With Quote
  #3 (permalink)  
Old 09-01-2007
Registered User
 

Join Date: Dec 2006
Posts: 0
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiReddit! Stumble this Post!Spurl this Post!
The issue with two different time zone

You can reach me at 704 644 5923
Reply With Quote
  #4 (permalink)  
Old 09-01-2007
Gollum's Avatar
Our Pet ForumBot
 

Join Date: Feb 2005
Posts: 64
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiReddit! Stumble this Post!Spurl this Post!
The issue with two different time zone

Quote:
Originally Posted by kirfan
You can reach me at 704 644 5923
No I don't think I can do reach me at 704 644 5923.
Reply With Quote
Google UNIX.COM
Reply



Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 06:11 PM.


Powered by: vBulletin, Copyright ©2000 - 2006, Jelsoft Enterprises Limited.
The UNIX and Linux Forums Content Copyright ©1993-2008 The CEP Blog All Rights Reserved -Ad Management by RedTyger

Search Engine Optimization by vBSEO 3.1.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102